Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2026 at 7:00 PM

Updated November 10, 2026

Site work and renovation of a municipal facility in Pueblo, Colorado. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

ADA accessibility improvements and facility upgrades. Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule. Request for Clarifications Due Nov. 11, 2026, 5:00 p.m. (MST) Final Addendum Issued (anticipated) November 17, 2026 Scope of Services The Project consists of various accessibility (ADA) improvements to the Davis Academic Building to bring it into current code compliance, including, but not limited to: creation of three new single-occupant restrooms (Lower Level , Main Level, and Upper Level), door hardware and door operator modifications, casework modifications, plumbing fixture modifications, and signage, all as further described in the Construction Documents (Drawings and Project Manual), prepared by Hall Architects, dated October 14, 2026, included in the Appendices. Bidders shall provide pricing for the following Additive Alternates, described further in the Project Manual and Drawings: AA1 - Sensory Room 015A remodel and associated electrical ; AA2 - exterior northwest concrete stair repairs and new handrails; AA3 - Break Room 045 casework replacement (countertop, base cabinet, sink, and faucet); AA4 - Vending Area 145 countertops and associated electrical. The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project. The contractor will also be required to provide a phasing plan for their scope of work that addresses working in an occupied building, including access, egress, noise, dust control, and coordination with Davis Academic Building staff and student needs. The building will remain occupied and in use during construction . To the greatest extent possible, demolition and other high -noise workshall be completed between the anticipated construction start (January 4, 2027) and the start of spring semester classes (January 19, 2027).

GC Bidding

$824,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
27
Bidding Soon
316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2026

January 4, 2027

Project location map

900 W Orman Ave, Pueblo, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed