Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 1, 2026

Site work and paving for a mixed-use development in Atlanta, Georgia. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and bridge / tunnel.

The City of Atlanta (the City) issues this Request for Proposal (RFP) to solicit proposals from qualified and experienced Offerors to provide replacement of the distressed existing Marietta Road Bridge over the former CSX Tilford Yard. The existing bridge is a weight-limited bridge (currently signed at 10 tons) on Marietta Road over the CSX Tracks just South of Thomas St NW. The existing bridge is a 423.5 feet long 5 span concrete box beam bridge which was built in 1971. The bridge replacement will be a new structure, pavement, curb and gutter, and a continuous, 5-foot sidewalk on each side of the bridge. The proposed project also includes a continuous standard 5-foot sidewalk along Marietta Road from the south of the bridge to Perry Boulevard/West Marietta Street (about 0.8 mile segment) To replace the existing Marietta Road bridge over the former CSX Tilford Yard, with a new bridge structure, pavement, curb and gutter, and a continuous 5-foot sidewalk on each side of the bridge. The proposed project also includes a continuous standard 5-foot wide sidewalk along Marietta Road from the south of the bridge to Perry Boulevard/West Marietta Street (about 0.8 mile segment). The bridge design shall conform to American Association of State Highway Transportation Officials (AASHTO) LRFD Bridge Design Specifications, 4th Edition, Georgia Department of Transportation (GDOT) Bridge and Structures Design Policy Manual , design memos, and standard practices where possible, GDOT Standard Specifications 2001 with 2008 Supplemental Specifications or latest version, and the GDOT Plan Development Process. The consultant will need to inspect the existing field conditions of the bridge. Due to GDOT federal funding, the LAP process will have to be strictly followed. All work performed shall conform to applicable federal , state and local laws. The Consultant wages shall conform to the Brooks Act. The Consultant shall develop the required reports. This project will be delivered via Task Order throughout the Contract's duration. The consultant shall provide concept development, complete field surveys (survey control package, openroads survey database, staking for bridge site inspection and staking for right of way acquisition) and data enhancements for this project. The consultant shall ensure quality control and quality assurance for all deliverables. All deliverables shall be in accordance with the Plan Development Process (PDP), Electronic Data Guidelines (EDG), GDOT Design Policy Manual , Plan Presentation Guide, Georgia Environmental Policy Act (GEPA) and the GDOT Environmental Procedures Manual. Compliance with all Federal EEO requirements is required for Federally Funded projects. The scope of work shall consist of the following services: The national goal for participation of Disadvantaged Business Enterprises (DBE) is 10%. The agency's overall goal for DBE participation is 31.5%. A separate contract goal of 31.5% DBE participation has been established for this procurement.

GC Bidding

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
115
Bidding Soon
2,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

December 23, 2026

Project location map

Marietta Rd NW, Atlanta, GA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed