Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 19, 2026

Renovation of a municipal facility in Troy, New York. Completed plans call for the renovation of a municipal facility.

Questions regarding this RFP must be submitted to Paul Donnelly Email: paul.donnelly@troycommunitylandbank.org Installation of drywall for the Troy Community Land Bank property. The Troy Community Land Bank has prepared a scope of work for 836 River Street in Troy, NY. The objective of this project is to PROVIDE AND INSTALL DRYWALL A. GENERAL SCOPE OF WORK FOR ALL BUILDINGS* *(In addition to /supported by the Owner-Contractor Agreement for a Fixed Contract Sum.) The term "Contractor" is to be understood to mean the Contractor submitting this particular bid proposal. 1. All General Conditions items necessary for this work: a. Daily clean-up of work areas and break areas as well as final cleanup. b. Full-time supervision, on-site, by the primary Contractor. c. All invoices to be submitted on AIA invoice forms. 2. Progress meetings will be held as needed to review the project progress to date, to outline and coordinate upcoming work, to discuss project safety, quality and any " problem areas", and to address any other matters affecting the project. a. Contractor is responsible for all work staging access, scaffolding, lifts, temporary scaffolding, shoring, supports, guys, braces, etc. b. Contractor is to furnish and install any necessary temporary coverings to protect work and all existing facilities and property, including dust protection as necessary unless otherwise indicated in the specific scope of work. Contractor shall return work areas to the same condition it was found at the beginning of the project. c. Contractor shall execute the work by means of workmanship that meets or exceeds industry standards. Any work that is found to be out of compliance with this requirement and/or the project specifications shall be repaired or emoved and replaced as directed by The Project Manager at no additional cost. d. Contractor is responsible for all cutting and patching required for installation of scope of work. e. Contractor to provide all Project close-out documentation at the time of Project Substantial Completion, identified in the Owner-Contractor Fixed Price Contract. Set-asides: 10% MBE, 30% WBE.

Post-Bid

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
135
Bidding Soon
2,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed