Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 21, 2026

Renovation of an educational facility in San Francisco, California. Completed plans call for the renovation of a educational facility.

Provision of design-build and construction manager services for the design, preconstruction, and construction of multiple projects under a master enabling agreement. Bonds: 0% Bid Bond, 100% Payment Bond, 100% Performance Bond. Projects The Projects may include, but are not limited to: Heating Hot Water Loop, Phase 3 This project is the third major phase of replacing the underground piping system that provides hydronic water from boilers at the central plant to campus buildings. The aging system has been a continuous problem. Advanced corrosion has resulted in costly emergency repairs of underground leaks that are often difficult to locate and access, requiring system shutdowns that are highly disruptive to business operations. The project replaces the old ductile iron system with superior thermoplastic piping and fittings. The replacement work takes place during the summer break periodCentral Plant Boiler Replacement This project replaces two 600 HP gas fired boilers at the central plant used for hydronic water generation that feeds the campus heating hot water loop. The 30-year-old units are highly inefficient and maintenance intensive with continual breakdowns. The fire tubes and inner walls have become increasingly difficult to repair. Campus Security and Access Control, Phase 1 This project upgrades electronic access control on state supported building perimeter doors, allowing University Police to monitor/control perimeter doors in the event of an emergency. The project includes new access control panels, dedicated circuits, electrified door hardware, card readers, contacts and motion detectors for campus perimeter doors. Dining Center, Phase 3 This project is a partial renovation of the existing City Eats Dining Center. The renovation consists of replacing the existing floor, wall and ceiling finishes in the servery area, the addition of new kitchen equipment for the pizza, simple servings, and South American fare platforms in the servery area. Installation of a new walk-in cooler and freezer as well as a new demising wall between the existing kitchen areas. The existing mechanical system and ductwork shall be modified to accommodate the new ceiling layout. Plumbing services connections to the food service equipment shall be provided. The existing electrical service and lighting shall be modified for the renovated areas. The existing fire alarm shall be modified to accommodate the renovation. Hensill Hall Fire Sprinkler System and Fire Alarm This project is for the installation of a wet-pipe sprinkler system in Hensill Hall, including valves and piping, sprinkler heads, piping supports , electrical, fire pump, abatement, fire alarm control panel, connection to UPD, and fire alarms equipped for ADA audio/ visual notifications. Sanitary Sewer / Storm Drain / Domestic Water Critical Projects This project completes priority scope for SS, SD, and DW systems as identified in the campus utility master plan. Included in the project is regarding and installation of additional storm drain inlets proximate to Thornton Hall and Burk Hall, sump pumps sin electrical and telecom vaults and connection of discharge piping nearby sanitary sewer. The project also provides upgrades to the campus main DW distribution system, replacement of DW lines in conflict with trees, installation of auto high-flow sensors and solenoid valves on each building's main service, and installation of new underground or wall mounted galvanized steel water service around Cox Stadium to replace existing exposed PVC piping and refeed drinking fountains. Thornton Hall Window Replacement The work consists of furnishing labor and material necessary to remove and replace the windows on Thornton Hall, including the removal and replacement of deteriorated and spalled concrete on the existing precast panels. University Park North Highrise Windows Replacement This project replaces the windows of four ten-story apartment buildings in University Park North Last day to submit RFQ questions Last day to submit Affidavit of Joint Venture Tuesday, November 17, 2026

GC Bidding

$44,096,400.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
141
Bidding Soon
3,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2026

July 26, 2027

Project location map

Multiple Locations, San Francisco, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed