Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 5, 2026

Site work and renovation of a water / sewer project in West Palm Beach, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

22117.01 TSFGeo File No. 7111-23-313 The City of West Palm Beach ("City") is accepting a bid from experienced , qualified and responsible Contractors to furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, equipment, machinery, tools, transportation, delivery, disposal of waste and surplus material , appliances, fuel , power, light, telephone, water, sanitary facilities, temporary facilities and all other appurtenances and incidentals necessary for the furnishing, performance, testing, start-up and successful completion of the Work as shown on the Construction Drawings set forth in Exhibit A and associated Technical Specifications set forth on Exhibit B, including the costs for all supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit for the complete and proper mechanical, electrical, structural, and landscaping required to rehabilitate and retrofit lift station no. 3 and no. 40. Funds for this Project are partially derived from a State of Florida, Department of Environmental Protection, Grant Agreement (#22SRP64) and therefore the successful Contractor must comply with federal guidelines. The Project involves improvements to two (2) lift stations, lift station no . 3 and lift station no. 40. Both lift stations are owned and maintained by the City's Public Utilities Department. The lift stations are located within the geographic boundaries of the city and close to the intracoastal waterway coastline. Lift station no. 3 is a duplex submersible station located at 106 Bloomfield Drive, West Palm Beach , Florida . Lift station no.40 is a triplex submersible station located at 600 Chase Street, West Palm Beach, Florida. Rehabilitation and retrofit of lift station no. 3 and no. 40, including mechanical, electrical, structural, and landscaping work. Question Deadline 11/06/2026 Questions or requests for information regarding this solicitation, should be addressed only to: City of West Palm Beach Procurement Division - 5th Floor 401 Clematis Street - City Hall West Palm Beach, FL 33401 Sharon Sepulveda, Procurement Supervisor Email : procurement@wpb.org Direct: 561.494.1056 Main: 561.822.2100 TTY: 800.955.8771

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
110
Bidding Soon
1,843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

December 30, 2026

Project location map

Multiple Locations, West Palm Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed