Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated November 12, 2026

Renovation of a detention facility in Gainesville, Georgia. Completed plans call for the renovation of a detention facility.

Complete roof replacement at the Hall County Jail. (Towers) - Only remove the old roof if necessary. Prepare the old roof surface to meet manufacturers' requirements for new fleece back TPO. Install new 60 mill Fleece back TPO to meet manufacturers' requirements. Adhere new TPO to meet manufacturers' requirements. Heat weld all laps and seams to meet manufacturers' requirements. Terminate outer edge of TPO to meet manufacturers' requirements. Replace all surrounding roof edge metal and all drip edge metal if necessary. Remove and reattach all lightning protection to new roof surface. Install new boot flashings at all pipes and penetrations. Reseal all pitch pans where necessary for A/C lines and power penetrations. Provide all lifts and necessary equipment for the duration of project. Provide management to be on site for the duration of project. Provide 5 - year workmanship warranty. Provide 20 - year manufactures warranty. (Administration Building) Remove and dispose of all old roofing and insulation materials Install insulation board to equal (R-30) to meet code requirements Install Dens Deck to add strength to roof surface Install crickets where necessary to divert water to roof drains and have (No) standing water on roof surface Install (white) 60 mill TPO attached to deck per manufacture's requirements Install TPO perimeter enhancement sheets (where applicable) and fasten to meet code and manufactures' requirements Install walkways to AC units for servicing All vertical TPO i.e. curbs , parapets, walls, etc. to be fully adhered with bonding adhesive per manufacture's requirements Heat weld all TPO seams per manufacture's requirements Terminate TPO with TPO drip edge (where applicable) Reseal all roof penetrations i.e. curbs, pitch pans etc. Install all new pipe boots Replace (all metal coping and drip edge metal as necessary) Reattach all lightning protection i.e. lightning rods , wire, brackets etc. Include 20yr manufactures warranty Include 5yr workmanship warranty Question Deadline 11/05/2026 All communications must be directed solely to Mike Hawkins, Issuing Officer at mhawkins@hallcounty.org

Sub-Bidding

$450,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
115
Bidding Soon
2,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2026

January 18, 2027

Project location map

1700 Barber Rd, Gainesville, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed