Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 15, 2026

Site work and renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

Installation of ADA-accessible Fastlane Glassgate turnstile lanes at various locations across campus. Question Deadline 11/13/2026 at 12:00 PM ET Questions pertaining to this IFB must be made in writing and sent to the College-Designated Contact Tawanikka Smith Director of Procurement and Contracts pricequote@lagcc.cuny.edu The Contractor shall provide a total of twenty-three (23) turnstile lanes across three campus entrances at LaGuardia Community College in Long Island City. The specified turnstile for all locations is the Fastlane Glassgate 150 Plus, manufactured by Smarter Security (the "Specified Product"), or a Proposed Substitute approved by the College (see Section 10 below). All turnstiles are ADA-accessible width, measuring 3 feet 0 inches clear, and are composed of individual stanchions with 304 grade stainless steel end and side panels and safety glass gate panels that open upon granted access. Each gate is equipped with an optical card reader and is connected to the local fire alarm system, allowing all gates to fail-safe open in the event of a building or full campus alarm activation. All turnstiles will utilize the Transact system currently in use by the College, providing scanned entry for students faculty, and approved school employees . Designated guest and visitor turnstiles at each location will be operated by security personnel via a control board or remote hot button, as described below . The turnstiles shall be provided and installed by the Contractor and shall meet all criteria set forth in the product specifications. The requirements for each of the three campus entrances are described below: A. Building E Thomson Avenue Entrance The Contractor shall provide eight turnstiles in two arrays at the Thomson Avenue entrance to Building E. Power and data will be provided from existing panels in electrical distribution rooms and communications rooms via conduit wireway troughs within the floor slab. Minor demolition and repair to two existing walls may be required to install the troughs and make connections to the existing local power, communications, and fire alarm control panels. Two turnstiles, located nearest to the future security desk location, shall be designated for guest access. The control board shall be procured and installed with the ability to be modified by the College later with the installation of the new security desk. Floor troughs for power and data routing shall be provided under this phase. Additional glass barriers in the lobby and entrance vestibule will be installed at a later date, and are not covered by this IFB. B. Building E Van Dam Street Entrance The Contractor shall provide four turnstiles in one array at the Van Dam Street entrance to Building E. Power and data will be provided via new wall-mounted panels in the lobby, fed from existing panels in electrical distribution rooms and communications rooms via conduit wireway troughs within the floor slab connecting to the existing conduit system of the school. One turnstile, located nearest to the future security desk location, shall be designated for guest and visitor access. The control board shall be procured and installed under this phase with the ability to be modified by the college later with the installation of the new security desk. Floor troughs for power and data routing shall be provided under this phase. Additional glass barriers in the lobby and entrance vestibule will follow in Phase 2 . C. Building C Thomson Avenue Entrance The Contractor shall provide eleven turnstiles in three arrays at the Thomson Avenue entrance to Building C. The arrays are arranged on both sides of the existing security desk, providing controlled access to either side of the building from the lobby. Low voltage power and data will be provided from existing panels in electrical distribution rooms and communications rooms via slab-cored penetrations, with cabling routed through the basement space below and fed up to each stanchion via junction boxes and conduit anchored to the slab. The control board shall be installed within the existing security desk, and two turnstiles, one on each side of the desk, shall be designated for guest and visitor access. Additional glass barriers will follow in Phase 2.

Sub-Bidding

$550,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,316
Active Projects
459
Bidding Soon
7,466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

December 30, 2026

Project location map

Multiple Locations, New York, NY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access