Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 26, 2026

Demolition, site work and renovation of a clubhouse / community center in Shippingport, Pennsylvania. Completed plans call for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

1. Select Demolition: All select demolition work shown on Drawing Sheets G0.00, D2.00 and A1.00 are included within this item. This item generally consists of, but is not limited to, removal of existing brick veneer; removal of existing concrete block brick ledge down to existing foundations; removal of existing rim joist and sill plate; removal of existing downspout; removal of existing handrail and brackets; removal of existing 2x lumber and anchors; removal of existing concrete; removal of existing steel angle and anchors; removal of existing concrete block and foundations below grade; and removal of all debris remaining from previous ramp demolition. 2. New Work: Construction of new brick veneer with corrugated wall ties at 1'-4" O/C; new brick soldier course to match existing brick and grout in size and color; new 4" concrete block brick ledge with corrugated wall ties at 1'-4" O/C; new concrete at existing door/threshold; new aluminum downspout including connection to existing stormwater management system; repair/rebuild of existing brick rowlock to match existing; replacement of sill plate and rim joists; and installation of compacted porous fill such as AASHTO No. 57 aggregate to grade within the limits of the existing ramp. Contractor shall provide proper shoring and protection of existing building materials to remain to prevent damage to existing materials. Complete improvements in proper sequencing as required to protect existing building materials to remain. No additional payment will be made for removal and replacement of materials beyond the limits shown on the Contract Drawings.

GC Bidding

$350,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
184
Bidding Soon
2,795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2026

January 8, 2027

Project location map

163 PA-3016, Shippingport, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed