Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 17, 2026 at 7:00 PM
Updated November 20, 2026
Site work and new construction of a mixed-use development in Cambridge, Ontario. Completed plans call for the construction of a 75,000-square-foot fire / police facility.
Qualified General Contractors, Mechanical Sub-Contractors, Electrical Sub-Contractors, Structured Cabling Sub-Contractors and Audio-Visual system Sub-Contractors are invited to submit PRE-QUALIFICATION information for the construction of the new Waterloo Region Public Safety Communications Centre (WR PSCC). The Waterloo Region Public Safety Communications Centre (WRPSCC) will stand as a state-of-the-art facility that exemplifies security, sustainability, and innovation, reflecting the evolving needs and core values of the Waterloo Regional Police Service and the Region of Waterloo. Purposefully designed for adaptability and resilience, the PSCC will drive operational excellence through the integration of emerging technologies, the prioritization of staff well-being, and the cultivation of a collaborative, inclusive workplace. The facility will serve as a benchmark in modern public safety and primary emergency response, built for today, equipped for tomorrow, and rooted in the values of people, partnerships, and professional excellence. The new facility is intended to replace the existing facility, which lacks the capacity to accommodate the continued growth in service demand and operational requirements. The proposed design will support expanded operations, increased onsite practical skills and classroom training needs, and the establishment of an Emergency Operations Centre (EOC), Media Centre, and Real-Time Operations Centre (RTOC). It will also provide the infrastructure required to support emerging technologies, including NG911, as well as additional administrative and office space. To accommodate the growth over the coming decades the new post-disaster, multi-storey standalone building will be located on the WRPS campus in proximity to existing WRPS headquarters and mission critical infrastructure and includes: - GFA of approximately 75,000 square feet; - Communications Centre with supporting training facilities - RTOC and Incident Command Centre - EOC and Media Centre - Board rooms and meeting rooms - Extensive integration of Audio-Visual technology across multiple programs/spaces - Enhanced security features such as compound security through fencing/gating, and card reader and CCTV technologies - Incorporation of existing and new Voice Radio technology - Net-zero carbon design based on CaGBC guidelines; - Electrical, mechanical and technological infrastructure with N+1 and 2N redundancies; - Specialized life safety, fire alarming and fire suppression systems; - Building Structural systems comprise of cast-in-place concrete, structural steel, mass timber and raised access flooring; - Exterior finishes include brick, curtainwall, clay tile and metal cladding; and - Integration to Region of Waterloo P25 Voice Radio system prime site at 230 Maple Grove via both microwave and data line connections for redundancy; It is anticipated that construction will start early 2027, with substantial completion targeted for November 30, 2028, deficiencies must be completed January 31, 2029 and the facility must be completed, fully commissioned, and Ready for Use by the Owner May 1, 2029 in accordance with strict timelines needed to meet WRPS operational goals. The construction cost for the project is estimated to be approximately $97,000,000, including an approximate budget for the Mechanical of $9.5M and Electrical of $16.5M. Documents are available at https://regionofwaterloo.bidsandtenders.ca/ Question Deadline: Tue Nov 10, 2026 4:00:00 PM (EST)
Post-Bid
$97,000,000.00
Public - County
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2026
February 15, 2027
230 Maple Grove Rd, Cambridge, ON
Related To This Project
Cambridge, ON
Bid Date: Oct 30 2026
Cambridge, ON
Bid Date: Oct 29 2026
Cambridge, ON
Bid Date: Nov 23 2026
Cambridge, ON
Bid Date: Nov 26 2026
Cambridge, ON
Bid Date: Nov 05 2026
Cambridge, ON
Bid Date: Oct 27 2026
Cambridge, ON
Bid Date: Oct 02 2026
Cambridge, ON
--
Cambridge, ON
--
Cambridge, ON
Bid Date: Sep 30 2026
Cambridge, ON
Bid Date: Nov 06 2026
Cambridge, ON
Bid Date: Sep 17 2026
Cambridge, ON
--
Cambridge, ON
Bid Date: Sep 10 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed