Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 6, 2026 at 7:00 PM
Updated November 12, 2026
Renovation of a mixed-use development in Gulfport, Mississippi. Completed plans call for the renovation of a educational facility; and educational facility.
**As of November 06, 2026, this project has not yet been awarded. The project is expected to be awarded on November 11, 2026.** Replacement of one Air Handling Unit (AHU-1) located in the cafeteria at the Harrison County Campus. Bonds: Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Each Bidder shall examine the bidding documents carefully and, not later than seven (7) days prior to date of receipt of bids, shall make written request to the Engineer for interpretation or correction of any ambiguity, inconsistency or error therein which he may discover or of any question he may have as to their meaning. Any interpretation or correction will be issued as an Addendum by the Engineer Every request for such interpretation should be in writing addressed to the following: 1. "Stephens Mechanical LLC, 925 Tommy Munro Drive, Biloxi , MS 39532. Scope: provide pricing, labor, rental equipment, and miscellaneous materials for a turn key project to remove an existing Carrier air handler unit located at the Cafteria building, first floor main mechanical room behind dumpster. The existing VAV air handler is not operational with failed cooling coil and heating coils being damage during heavy freeze. The air handler is equipped with a mixing box complete with filters, return dampers, outside air dampers. A hot water preheat follows the filter mixing box followed by spacer section, chill water-cooling coil, and then completed with a fan section . The unit is horizontal with the fan being vertical upblast. The unit is insulated double wall construction set on equipment rails. The unit has hinged access with door handles and latches. The unit is serviced with modulating three way control valves for both the hot water and chill water. Both the hot water and chill water piping has insulated piping with isolation valves. Controls are Siemens controls and may be of the Talon series . The controller for the unit interfaces to the Siemens Desiego main panel for the building that allows for front end communication at the maintenance facility. The fan is controlled by a differential pressure switch via a VFD that services the fan. The work shall be as follows but plans and specifications provide additional requirements - verify: A. Remove and dispose of existing air handler. Disconnect all piping, duct transitions, controls, and power. Remove VFD, if deemed intact may reuse the DP switch and wiring. Remove condensate drainage piping. Due to proximity of boiler and other pumps and devices, unit may require breaking down to basic parts. Clean area prior to brings in new unit. Contractor shall remove the dumpster for access and place out of way. This dumpster shall not be used for construction debris. B. Consult with Siemens controls for pricing their work to include all components for a fully operational system that matches or exceeds the previous controls. Siemens will download all points and sequences that currently operate the unit and that shall be minimum work. All devices other than DP for speed control will be new, installed , and point to point proofed with front end visibility. Be advised - there will be no equals for Siemens. C. Install new air handler per the specifications and drawings to provide a seamless installation with duct transitions, duct insulation , piping spool pieces ( may use existing with any necessary offsets, piping insulation), power for damper valves (may reuse existing), new VFD, new filters, and support isolators per previous. Rod out floor drain and insure not backed up with debris , and extend condensate piping to drain. Insulate condensate trap and piping to floor drain. Ensure piping is indicated with flow arrows and type of fluid (HWR, HWS, CWR, CWS for example). D. Absolute requirement - coordinate the project with MGCCC plant director of facilities, Brian Breland. No work may be performed until a preconstruction meeting is scheduled, contractor must bring an agenda of topics and a working schedule. Lay down, parking, access, and security will be discussed at that time. Currently no temporary dehumidifiers or hvac equipment is anticipated.
Post-Bid
$500,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2026
December 4, 2026
2226 Switzer Road, Gulfport, MS
Related To This Project
Gulfport, MS
--
Gulfport, MS
Bid Date: Nov 23 2026
Gulfport, MS
--
Gulfport, MS
Bid Date: Dec 01 2026
Gulfport, MS
Bid Date: Dec 04 2026
Gulfport, MS
Bid Date: Dec 02 2026
Gulfport, MS
Bid Date: Dec 10 2026
Gulfport, MS
--
Gulfport, MS
--
Gulfport, MS
--
Gulfport, MS
--
Gulfport, MS
--
Gulfport, MS
--
Gulfport, MS
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed