Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2026 at 7:00 PM

Updated November 19, 2026

Renovation of a playground / park / athletic field in Bryan, Texas. Completed plans call for the renovation of a playground / park / athletic field.

In order to ensure a fair and public process, all questions related to this Request for Proposals shall be addressed in writing, via the Brazos Valley Online Bidding System Question Deadline 11/06/2026 at 10:00 AM CT Project Scope: The city anticipates the scope of work for the Project to consist of the following responsibilities and the following items following items as reflected in the GLS Construction Plans dated Prepare site for City of Bryan purchased prefabricated restrooms in Midtown Park at the Legacy Playground and the northwest corner of the park as shown as Area "A" and Area "B" on the GLS Construction Plans. The restrooms are being purchased from CXT, Inc, Hillsboro Texas. Both restrooms will be delivered to midtown park and set in-place by CXT, Inc. Delivery date is TBD. When CXT, Inc. delivers the prefab units, all tie-in to the unit's utilities must be made that day and CXT, Inc. will operate all functions of the restrooms before they leave. This RFP response pricing will include the connections to the restrooms when they are delivered. Reference drawing set DK4-065- ST-PRINT-REV- 1 that is part of this RFP for Area "A" and CR-2018-ST-Print-Rev-0 for Area "B" restroom . o Utility services to the two restrooms require water, sewer and electricity and must be stubbed up with-in the building foot print per the drawings DK4-065-ST-PRINT-REV- 1 and CR-2018- ST-Print-Rev-0. Tree protection must be observed per the attached drawing TPD-19. o o The foundations for the restrooms are essentially the combination of the compacted sub-base material and the buildings reinforced slab. The pricing for the compacted sub-base material must be included in RFP. Flatwork around bathroom area "A" will have to be poured after the restroom buildings are set in-place and tied to the utilities. Sidewalk additions to be made per the bid documents. Flatwork to be doweled into foundation of the restrooms as required. Project Lighting is shown on the GLS Construction Plans around the perimeter of the Legacy Playground and ceiling/flood lighting in the pavilions. Restroom Additions o Sidewalk Additions Utility Services o Lighting Additions

Post-Bid

$200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
93
Bidding Soon
2,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

December 1, 2026

Project location map

206 W Villa Maria Rd, Bryan, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed