Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated October 30, 2026

Demolition, site work, asbestos abatement and renovation of an educational facility in Colorado Springs, Colorado. Completed plans call for the renovation of a educational facility; for the demolition of a educational facility; and for asbestos abatement for a educational facility.

Turn-key modernization and upgrade of student restrooms at Mitchell High School, Coronado High School, and Doherty High School. Work includes demolition, plumbing infrastructure replacement, installation of low-flow sensor-operated fixtures, LED lighting, high-speed hand dryers, HVAC exhaust system upgrades, and ADA-compliant finishes. Question Deadline 11/03/2026 at 12:00 PM MT Contractors are to submit written questions through Bidnet to the Contracting Office The Contractor must provide all labor, materials, equipment, tools, and supervision necessary to execute the design intents provided by Compass Architecture for the designated student restrooms. The scope includes, but is not limited to: Demolition & Abatement: Safe removal and legal disposal of existing student partitions, plumbing fixtures, flooring, wall tile, lighting, and accessories. Lead/asbestos abatement must be performed if flagged in the environmental reports. Plumbing & Infrastructure: Replacement of heavy-use domestic water lines, carrier systems, valves, and waste/vent piping back to the main risers as specified. Installation of vandal-resistant, low-flow, commercial-grade, sensor-operated flushometer toilets and urinals. At Mitchell High School, remove (3) existing drinking fountains and install district-provided bottle filler/drinking fountain combination units, including addition of new electrical circuits to each. Electrical & HVAC: Installation of moisture-resistant, tamper-proof LED lighting fixtures, integrated occupancy sensors, high-speed automatic hand dryers, and upgrades to exhaust fan systems to meet modern CFM airflow requirements for high-traffic student facilities. Finishes & Specialties: Installation of high-durability floor and wall tiling (including waterproofing membranes), heavy-duty solid plastic (HDPE) doors, institutional-grade framed mirrors, multi-station or individual sensor lavatories, soap dispensers, and highcapacity waste receptacles. ADA Compliance: Strict adherence to building layouts, grab bar placements, counter heights, and turning radiuses as detailed in the Compass Architecture documents to ensure full accessibility in all student stalls.

GC Bidding

$1,500,000.00

Public - City

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
78
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2026

January 7, 2027

Project location map

Multiple Locations, Colorado Springs, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed