Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2026 at 7:00 PM

Updated November 19, 2026

Site work and new construction of a mixed-use development in Provo, Utah. Completed plans call for the construction of a water / sewer project; and municipal facility.

Provision of preconstruction services for the Provo City Water Reclamation Facility Administration and Collections Buildings, involving specialty building construction management/general contracting services. Question Deadline 11/12/2026 at 5:00 PM MT Deadline to submit Questions online Following is a brief description of the Work for which the preconstruction services specified in the Preconstruction Services Agreement are to be performed. Currently, the City intends to provide multiple packages for the construction of the Provo Water Reclamation Facility Administration and Collections Buildings Project. A 1 SUMMARY A. Preconstruction Services - approximately 8 months from December 2026 to July 2027. B. Collections Building 1. It is intended that the collection building be partially available for collection system trucks and equipment storage and parking by October 2027. To achieve this schedule, it is anticipated that the Collection Building will be implemented using early procurement and packaging. A tentative packaging plan is shown below and will be discussed and evaluated with the selected CMGC. 2. The building will be a concrete masonry building with standing seam metal roofing designed to match other structures on site. The Collections building will be a large shop space with four double truck bays used for storing and washing down trucks and equipment used for maintaining the Provo City Sewer Collections System. The building will feature a 2 -ton monorail crane, overhead coiling doors on both the North and South end of each truck bay, an interior and exterior truck wash station, and floor drains at each truck bay tied into the PCWRF plant drain system. The East end of the building will have office spaces for the Provo City Collections Operations team, locker room space, restrooms, a conference room, breakroom, IT room, and storage space. 3. The design associated with the Collection Building is at 60% level and is proceeding with the intent to complete the design and permitting by April 2027. To achieve partial completion by Fall 2027, it is anticipated that the start of construction will overlap with the permitting phase. 4. It is anticipated that the work listed below will be completed in a minimum of four (4) construction packages coinciding with the available funding and to construct the individual elements listed in paragraphs below. Preconstruction services will be provided for all of Project elements listed. 5. Funding for all packages has already been secured. The anticipated construction packages are described as follows: a) Package 1 - Ground Improvement - will commence construction in the 1st quarter of 2027 and will consist of the micropile foundation plan improvements required to support the administration and collection systems building. The design for this portion of the work is complete and ready to be constructed. b) Package 2 - Structural - will commence construction in the 2nd quarter of 2027 and is anticipated to include the construction of the footings, foundation, walls and roof for the PCWRF Collections Building. c) Package 3 - Exterior Doors and Windows - will be completed by the 3rd quarter of 2027 andis anticipated to include all exterior doors and windows to allow the City to use the building to shelter the Collection System Vactor trucks and other equipment by October 2027. d) Package 4 - All other Activities - This will include completing all other activities including HVAC, electrical, plumbing, and equipment, installation of the monorail crane, utility service (water, electricity, natural gas), truck wash equipment, and construction of the interior office/locker room/meeting/etc. spaces will take place This will include fixtures, furnishings and equipment required to outfit the interior occupied spaces of both building, including laboratory equipment, kitchen and bathroom fixtures, appliances, and furnishings, locker room lockers and benches, flooring, materials, and color selections for interior spaces. e) Additional packages are Optional and may be interim packages or be completed at the end of Package 4. The additional construction packages will include those project elements that were not completed in other aforementioned packages.

GC Bidding

$450,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
45
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2026

December 24, 2026

Project location map

1685 S E Bay Blvd, Provo, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed