Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated October 29, 2026

Renovation of a medical facility in Oshkosh, Wisconsin. Completed plans call for the renovation of a medical facility.

In general the work consists of replacement of the fire alarm system field devices throughout the campus at Winnebago Mental Health Institute. 3 buildings across campus are included in this scope of work including Sherman Hall, Petersik, and Gordon Hall. The scope includes replacing all initiation and notification appliances including smoke and heat detectors, horns, strobes, and pull stations. Areas housing patients will require anti-ligature, vandal resistant devices. Speaker/strobe combination devices will replace existing horn notification. Wiring/conduit upgrades and additional Amplifiers and NAC booster panels are required. Notification appliance circuits and initiating device circuits will be fully new. The fire alarm panels were recently upgraded and will be existing to remain, serving the new field devices and EVAC amplifier. The existing fire alarm system must remain fully functional during construction, phased in a way to minimize outages and impact on daily facility operations. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.

Sub-Bidding

$60,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
74
Bidding Soon
1,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2026

January 14, 2027

Project location map

4100 Treffert Dr, Oshkosh, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed