Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 23, 2026

Site work and renovation of a municipal facility in Redwood City, California. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Question Deadline 11/02/2026 at 1:00 PM PT Questions regarding this project shall be submitted and only accepted through the County Office Building. The Engineer's estimate for the scope of work of this Project is $13,000,000 to $15,000,000. The Department of Public Works (Department) is seeking a general contractor for the County Office Building 1 Renovation and Modernization Work Package 2 (WP2) Project (Project No. P33Z1 ) (Project). The anticipated construction is to be performed at 455 County Center, Redwood City, CA 94063. The work to be done consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required as well as any other items and details not mentioned but required by the Contract Documents and Project Specifications and as directed by the Director of Public Works or designee. he Project includes interior remodel of a portion of Level 1 and all of Level 2 including abatement, demolition and construction of non-load bearing partitions; suspended acoustic ceilings and lighting; doors, frames and hardware; finishes; and mechanical, electrical and plumbing systems. The Work also includes modifications to systems with equipment and plumbing connections to be located in the Basement. The Project also includes the following basis of design scopes: a fire alarm system and a fire suppression system for all of Level 1 and Level 2; an Audio Visual System and Equipment in Conference Room 101; expanding the existing Access Control System to include new doors; and limited signage. Renovation and modernization of County Office Building 1, providing all labor, materials, tools, appurtenances, and equipment required for the project. Issue Notice of Intent to Award:November 30, 2026 Anticipated Contract Award Date:December 8, 2026 Anticipated Notice to Proceed:January 4, 2027 Project ID: 2027-RFP-00118

GC Bidding

$15,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
145
Bidding Soon
2,998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

January 22, 2027

Project location map

455 County Center, Redwood City, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed