Published October 31, 2026 at 8:00 PM

Updated November 2, 2026

Site work and new construction of a water / sewer project in South Kingstown, Rhode Island. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Design, build, and construct a permanent PFAS water treatment facility including associated sanitary sewer system components. The selected Design-Builder shall be responsible for providing all engineering, architectural design, permitting, civil , landscape architecture, construction, equipment integration, geotechnical engineering, site survey, startup, testing, and commissioning required to deliver a complete and fully operational permanent Water Treatment Facility (WTF). The work shall be based on the January 2025 Basis of Design (BOD) bridging documents, Exhibit A. The permanent improvements include, but are not limited to, the construction of new Permanent Water Treatment Facility, including the following: Structural Additions : North Addition (75' x 60 ') to house greensand filtration, controls, and utility spaces. South Addition (23' x 42') to house the second GAC filtration system and chemical feeds. Process Systems: Installation of one (1) horizontal pressure filter system utilizing GreensandPlus media or equal, with a design flow of 1,100 gpm; and one (1) additional pair of 12-foot-diameter GAC adsorbers (Aqueous Vets Model 12-1240 Lowpro or equal). The GAC vessels are prepurchased under the Interim Project and assigned to the successful Design-Builder, who will assume ownership, coordinate delivery, and complete installation and integration to operate in a lead/lag configuration with the existing interim GAC pair. The scope also includes a 57,000-gallon below-slab concrete backwash waste storage tank. Well Pump Upgrades: Replacement of vertical turbine pumps at Wells 2 , 3, and 4 with higher TDH pumps to overcome an additional 108 ft (47 psi) of process headloss. Chemical Feed Systems: Upgrade of chemical feeds transitioning from hydrated lime to 45% Potassium Hydroxide (KOH) for pH adjustment and upgrading Liquid Sodium Hypochlorite systems. Site/Civil & Utilities: Refer to Exhibit A Electrical & SCADA: New 800A, 480V, 3 -phase service panel, 400 kW, 4160/2400V exterior standby diesel generator, and comprehensive SCADA system integration.

GC Bidding

$3,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
739
Active Projects
340
Bidding Soon
4,907
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2026

January 18, 2027

Project location map

45 Upper College Rd, South Kingstown, RI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed