Published November 17, 2026 at 7:00 PM

Updated November 21, 2026

Site work and environmental remediation for a development in Madisonville, Kentucky. Completed plans call for environmental remediation for a development.

Reclamation of approximately 74 acres of land affected by previous coal mining operations. Project includes backfilling 2000 linear feet of highwall, eliminating 14 acres of mine pits, constructing acid mine drainage treatment cells, grading spoil piles, and applying lime to acidic areas to prepare for vegetation. Question Deadline 11/20/2026 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered. There are multiple access points from public roads for the project. The project consists of backfilling approximately 2000 linear feet of mining highwall and eliminating approximately 14 acres of mine pits. Some pits will be backfilled with adjacent onsite mine spoil material as part of eliminating the mining highwall . The designated highwall areas will be backfilled at slopes no steeper than 3h: 1v using adjacent mine spoil . The pits will be capped with the best material available on site. Some pits will be used in the construction of long-term water treatment cells to reduce acid mine drainage. The water in all pits will be treated and raised to a pH of 6 or greater prior to release in accordance with KYDAML Technical Specifications. Acidic spoils adjacent to the pit shall be used first in backfilling the pit to eliminate the acid forming potential of these materials. This effort will require additional effort and may require double handling of some soils. The final grade of spoil ridges will be no steeper than a 3 : 1 slope, and the highwall backfill will be no steeper than a 3 :1 slope. Acid mine drainage treatment cells will be constructed in the northern number nine coal seam mine bench utilizing the existing mine pits. The treatment cells will be built according to AML technical specifications and will include limestone sand, straw/hay, compost/manure and hardwood bark mulch or equivalents. Barren coal refuse, unvegetated fireclay and/or coal slurry pits are included in this project and will be reclaimed. Adjacent spoil piles will be graded, and spoil material will be pushed over the refuse/slurry/fireclay areas. Limestone Sand and/or Agricultural Lime will be applied to some areas prior to covering with spoil. A borrow pit is shown on the plans for borrow material and this material will be transported by truck to the #11 mine bench and used as final cover material . These borrow areas will be developed as shown unless exploration pits determine the borrow unsuitable. In which case, the borrow areas will shift slightly but still will lie within the 400-acre project footprint. The total acreage of disturbance will not increase, only change location slightly to make use of better borrow material. AML representatives will make the final determination whether the borrow material is suitable. Borrow Material will be paid for as shown on the bid schedule for Earthwork Borrow Material on a cubic yard basis for material hauled in a truck from the designated borrow area to the final placement area. This yardage is not included in EARTHWORK - MINE SPOIL, REFUSE. The volume will be estimated by truck count then measured by a before and after survey. This material will be used as a final cover material in areas where spoil material is not conducive to supporting vegetative growth . Blasting will not be permitted in any work areas. Work for this project will involve the removal of trees measuring over 3-5 inches in diameter at breast height (DBH) at the project location . This cutting shall occur from November 15th March 31st, when the imperiled forest-dwelling bats are either within or in the immediate vicinity of their winter hibernacula. The contractor can burn cleared trees, or in some cases may windrow them. The landowners have been given the opportunity to harvest timber prior to the project, and timber remaining within the 74-acre project limits can be removed from the site by the contractor under this contract.

GC Bidding

$2,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
39
Bidding Soon
816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

February 1, 2027

Project location map

Multiple Locations, Madisonville, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed