Published November 13, 2026 at 7:00 PM

Updated November 19, 2026

Site work and renovation of an educational facility in Appleton, Wisconsin. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Updates to Electrical Engineering Classrooms in the D.J. Bordini Center including painting, casework, electrical, and data systems. Question Deadline 11/04/2026 at 4:00 PM CT All requests for clarification or interpretation shall be directed via e-mail to: purchasing@fvtc.edu . Fox Valley Technical College is soliciting quotes for updates to Electrical Engineering Classrooms in the D.J. Bordini Center. There will be updates to paint, casework, electrical , and data. The work will be awarded to one contractor per trade. A. Provide all labor, supervision, materials, tools and equipment to complete project. B. Contractor(s) is responsible for complying with all Federal, State, and Local regulations, codes and to obtain all permits required to perform this work. C. Contractor(s) is responsible for coordinating all rough- in and final inspections needed. D. Contractor(s) is responsible for final clean of construction and adjacent areas. E. All field measuring, layouts and verifications for this work. F. All unloading and distribution of materials/equipment. G. Protection of areas adjacent to work area and along path of travel to/from the work area . If any damage occurs during construction, it will be the responsibility of general contractor to replace the damaged components. H. Lawful disposal of debris . It is the responsibility of the general contractor to provide dumpster(s) for all contractors onsite. Provide temporary partitions and protection as needed to contain work area. Awarded contractor shall provide a plan to FVTC for approval. All wood blocking and fire rated wood blocking required for this Contract and necessary for all other trades, and blocking required for Owner provided items including demountable wall partitions. K. Repair, patch and clean all existing surfaces scheduled to remain that are affected by demolition or new construction; make it to appear new. L. Contractor shall carry allowances as outlined in specification section 01 21 00. Contractor shall notify FVTC before any amount of the allowance is used during the course of construction. Any unused amount will be credited back to FVTC. Electrical - Install: El 1 . Furnish and install new power, per plans. Furnish and install all new data cables and/or existing reused data cables as shown on attached plans. Electrical contractor is responsible for testing new and existing relocated data cables. Data test reports shall be submitted in electronic format to FVTC. Final Payment for the work will not be made if the report(s) has not been submitted. Electrical/Data contractors responsible for their own cleanup and waste Painting-Install: Patch walls that are identified for paint, per plan Apply one (1) coat of paint to identified walls, per plan. 2.1. Paint only needed on wall above markerboard Prepare texture and prime as needed where wall repairs are completed . 3.1. Texture shall match existing room texture. Painting contractor responsible for their own cleanup and waste Casework Install: CI 1. Furnish and install casework and countertops per plan. CI 2. Casework contractor responsible for their own cleanup and waste including wiping down the new casework and countertop surfaces.

Post-Bid

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
30
Bidding Soon
748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

December 21, 2026

Project location map

5 N Systems Dr, Appleton, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed