Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2026 at 7:00 PM

Updated November 23, 2026

Site work and new construction of a water / sewer project in Red Oak, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of approximately 2,100 linear feet of 12-inch water line and 600 linear feet of 10-inch water line, including underground utility work. Furnish all labor, materials, equipment and incidentals necessary to perform all trenching for pipelines and appurtenances, including drainage, bedding, filling, backfilling, disposal of surplus material, and restoration of trench surfaces and easements. B. Excavation shall be extended to the width and depth shown on the Drawings or as specified and shall provide suitable room for installing pipe, structures and appurtenances. C. Furnish and place all sheeting, bracing and supports and remove from the excavation all materials which the Engineer may deem unsuitable for backfilling. The bottom of the excavation shall be firm, dry, and in all respects acceptable. If conditions warrant, the Contractor may be ordered to deposit gravel for pipe bedding, or gravel refill for excavation below grade, directly on the bottom of the trench immediately after excavation has reached the proper depth and before the bottom of the trench has become softened or disturbed by any cause whatever. The length of open trench shall be related closely to the rate of pipe laying. All excavation shall be made in open trenches. D. All excavation, trenching, and related sheeting, bracing, etc., shall comply with the requirements of OSHA excavation safety standards (29 CFR Part 1926.650 Subpart P), and H.B. 1569 of the 71st Regular Legislative Session. E. Wherever compaction requirements are referred to herein it shall refer to Standard Proctor Density as determined by ASTM D 698. F. Prior to the start of work the Contractor is required to submit his/her proposed method of backfilling and compaction to the Engineer for review. QA date - 11-12-2026 Any questions regarding these specifications or contract may be directed to Jared Binford, Director of Public Works at (469) 218-7744. Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. Any explanation, clarification, questions, or interpretation desired by a Bidder relating to any part of this solicitation must be requested in writing to the Purchasing Manager not less than five (5) business days before bid closing. Request for explanations or clarifications may be emailed to adixon@redoaktx.org

Post-Bid

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
154
Bidding Soon
4,589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2026

December 17, 2026

Project location map

Carson St, Red Oak, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed