Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 25, 2026

Site work and new construction of a mixed-use development in Lexington, Kentucky. Completed plans call for the construction of a 2,080,000-square-foot, 895-bed medical facility; and power facility.

Construction involves expanding infrastructure within Substation 1 including a new transformer and switchgear building with associated equipment and work in Substation 3. Scope includes underground electrical duct banks throughout the EPCF, CUP, and Garage sites, as well as wire, terminations, and energization to provide main normal and emergency power distribution. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. All pre-bid requests for information (RFIs ), or other communication must be in written format and should be submitted to: UKChandlerWTJV@walshgroup.com The RFI cut-off date is 3:00 pm (EST) on 11/11/2026. The Expand Patient Care Facility project will involve the construction of a 2.08 million SF, 895-bed facility, with the focus on the expansion of the Expand Patient Care Facility. The building will accommodate additional inpatient beds and clinical support services. General services targeted for this location include, but are not limited to, adult and pediatric inpatient rooms, observation spaces, operating rooms, minor procedures, diagnostic services , imaging services, pharmacy, retail, lab, administration, support, and meeting spaces. The ESP-3.3 scope of work includes expanding the infrastructure within the existing Substation #1 with a new transformer and switchgear building with all associated equipment as well as work in Substation #3. The scope of work also includes underground electrical duct banks throughout the EPCF, CUP, and Garage sites, along with wire, terminations, and energization. The electrical infrastructure provided in this ESP will provide the main normal and emergency power distribution for the new projects on site. See schedule, schedule & logistics narrative, and logistics plans for detailed information. ESP-3.3 Contains the following Trade Categories available for Bidding: ESP-3.3 BP #001.01 - General Trades ESP-3.3 BP #026.01 - Electrical Future bid opportunities will be available for other packages associated with Project 2615.0.

Sub-Bidding

$2,000,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
106
Bidding Soon
1,420
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2026

February 4, 2027

Project location map

Multiple Locations, Lexington, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed