Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 10, 2026 at 7:00 PM
Updated November 18, 2026
Renovation of a library in Avon Lake, Ohio. Completed plans call for the renovation of a library.
Media Center refresh involving flooring, electrical, interior painting, carpentry, and interior architectural roofing improvements. Question Deadline 11/10/2026 at 2:00 PM ET All questions must be submitted in writing to Janik Tackett, INCompliance Consulting, at ICNPC@incompliance.com Scope of Services The Basis Project the renovation and refresh of the High School Media Center. The anticipated scope includes, but is not limited to, the following: 1. Flooring Removal and replacement of existing flooring throughout the Media Center. Replacement of selected carpeted areas with luxury vinyl plank (LVP) flooring to create a continuous pathway between the front and rear stairwell entrances and to align with flooring improvements completed in other areas of the High School. Replacement of remaining carpeted areas with new carpet and/or carpet tiles. Associated floor preparation , transitions, accessories, and finish work necessary for a complete installation. 2. Electrical and Associated Concrete Work Reconfiguration of electrical systems to accommodate relocation of the circulation desk and the creation of a coffee shop-style collaboration area. Installation of power and data connections to support flexible use of the Media Center, including a designated Board meeting area. Construction of new in-floor power locations as required. Saw-cutting, removal, patching, and restoration of existing concrete slabs necessary for the installation, relocation, or abandonment of electrical services. All related electrical, communications, and low-voltage work required for a complete and operational installation. 3. Painting and Finish Carpentry Preparation and painting of all walls, trim, and related interior finishes within the Media Center. Installation of decorative and/or finished trim around existing built-in wood bookcases and adjacent drywall surfaces. Caulking, surface preparation, patching, and finish work necessary to provide a complete, uniform appearance. 4. Decorative Interior Roof Feature Furnishing and installation of a decorative interior roof-inspired architectural feature within the Media Center. Construction of framing, trim, and related finish components necessary to create the desired appearance. All labor, materials, equipment, and incidental work necessary to provide a complete and finished installation.
Post-Bid
$450,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2026
May 31, 2027
175 Avon Belden Rd, Avon Lake, OH
Related To This Project
Avon Lake, OH
Bid Date: Nov 25 2026
Avon Lake, OH
Bid Date: Dec 01 2026
Avon Lake, OH
--
Avon Lake, OH
Bid Date: Nov 25 2026
Avon Lake, OH
Bid Date: Oct 26 2026
Avon Lake, OH
--
Avon Lake, OH
Bid Date: Sep 10 2026
Avon Lake, OH
Bid Date: Jul 09 2026
Avon Lake, OH
Bid Date: May 06 2026
Avon Lake, OH
--
Avon Lake, OH
Bid Date: Apr 22 2026
Avon Lake, OH
Bid Date: Mar 27 2026
Avon Lake, OH
Bid Date: Mar 23 2026
Avon Lake, OH
Bid Date: Mar 31 2026
Avon Lake, OH
Bid Date: Mar 23 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed