Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 5, 2026 at 7:00 PM
Updated November 10, 2026
Site work for a water / sewer project in Hollywood, Florida. Completed plans call for site work for a water / sewer project.
The City of Hollywood Department of Public Utilities is seeking qualified contractors for the Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25-11070) located along South 8th Avenue and North Southlake Drive. The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility. To maintain essential uninterrupted stormwater service during construction, Phase 1 requires the contractor to establish and operate a fully automated, 20,000 GPM bypass pumping system utilizing MWI hydraulic pumps, temporary discharge piping over the seawall, concrete equipment pads, and security fencing. Once the bypass system is proven operational for one week, Phase 2 structural rehabilitation will commence. Scope for this phase includes demolition of existing pump well top slabs and apparatus, pouring a new reinforced concrete top slab, executing localized CMU wall and concrete spall/crack structural repairs, and installing new pumping equipment and control drive units. The final phase involves full site restoration, including removing all temporary bypass piping and equipment, restoring affected asphalt pavement, concrete sidewalks, and sodded areas, and ensuring all drainage structures and outfalls meet municipal standards. Qualified vendors with strong expertise in municipal utility infrastructure, temporary flow bypass management, and heavy structural concrete restoration are invited to submit bids. The City of Hollywood Department of Public Utilities is seeking qualified contractors for the Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25- 11070) located along South 8th Avenue and North Southlake Drive. The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility. To maintain essential uninterrupted stormwater service during construction, Phase 1 requires the contractor to establish and operate a fully automated, 20,000 GPM bypass pumping system utilizing MWI hydraulic pumps, temporary discharge piping over the seawall, concrete equipment pads, and security fencing. Once the bypass system is proven operational for one week, Phase 2 structural rehabilitation will commence. Scope for this phase includes demolition of existing pump well top slabs and apparatus, pouring a new reinforced concrete top slab, executing localized CMU wall and concrete spall/crack structural repairs, and installing new pumping equipment and control drive units. The final phase involves full site restoration, including removing all temporary bypass piping and equipment, restoring affected asphalt pavement, concrete sidewalks, and sodded areas, and ensuring all drainage structures and outfalls meet municipal standards. Qualified vendors with strong expertise in municipal utility infrastructure, temporary flow bypass management, and heavy structural concrete restoration are invited to submit bids. 1.2. Background Pump Station SW-2 is a key flood mitigation asset managing stormwater drainage into South Lake at S. 8th Avenue and N. Southlake Drive. Exposure to harsh coastal conditions necessitates structural repairs to the building and an overhaul of the pump well infrastructure to restore longterm operational reliability. Key Project Challenges o Uninterrupted Drainage: Maintaining full flood protection requires operating a fully monitored 20,000 GPM bypass pumping system for one week before starting structural demolition. Tight Site Footprint: Work occurs adjacent to residential properties and a seawall, requiring strict spatial coordination and compliance with municipal noise ordinances. Structural Execution: Rehabilitating aged CMU walls, executing concrete spall repairs, and casting a new reinforced top slab require high-precision structural work. Project Description The City of Hollywood Department of Public Utilities is soliciting bids for the Pump Station SW-2 Bypass Pumping & Rehabilitation project (City Project No. 25-11070), located at South 8th Avenue and North Southlake Drive. The initiative involves executing a three-phase rehabilitation to modernize and restore the structural integrity of the stormwater pumping facility. o o Phase 1 (Bypass Operations): Install and operate a 20,000 GPM temporary bypass pumping system with automated monitoring to maintain uninterrupted stormwater drainage. Phase 2 (Structural Rehabilitation): Demolish existing pump well top slabs and apparatus, cast a new reinforced concrete slab, repair concrete spalls and CMU walls, and install new pumping equipment and drive units. Phase 3 (Site Restoration): Remove temporary bypass piping, demobilize equipment, and restore affected pavement, sidewalks, and sodded areas to municipal standards. Key Project Challenges Uninterrupted Drainage: Maintaining full flood protection requires operating a fully monitored 20,000 GPM bypass pumping system for one week before starting structural demolition. Tight Site Footprint: Work occurs adjacent to residential properties and a seawall, requiring strict spatial coordination and compliance with municipal noise ordinances. Structural Execution: Rehabilitating aged CMU walls, executing concrete spall repairs, and casting a new reinforced top slab require high-precision structural work. All questions must be submitted in writing via the Portal by Thursday, November 5, 2026, by 5:00 pm, in order to receive a timely response Construction Estimate $ 3 Million Submittals shall be considered a bid on the part of the bidder, which bid shall be deemed accepted upon approval of the City, and in case of default, the City reserves the right to accept or reject any or all bids, to waive irregularities and technicalities, and request new bids The City also reserves the right to award any resulting agreement as it deems will best serve the interests of the city.
GC Bidding
$3,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2026
January 25, 2027
S 8th Ave & N Southlake Dr, Hollywood, FL
Related To This Project
Hollywood, FL
Bid Date: Dec 03 2026
Hollywood, FL
Bid Date: Dec 03 2026
Hollywood, FL
Bid Date: Nov 17 2026
Hollywood, FL
Bid Date: Dec 03 2026
Hollywood, FL
Bid Date: Nov 18 2026
Hollywood, FL
Bid Date: Nov 17 2026
Hollywood, FL
Bid Date: Nov 06 2026
Hollywood, FL
Bid Date: Oct 22 2026
Hollywood, FL
Bid Date: Nov 10 2026
Hollywood, FL
Bid Date: Oct 22 2026
Hollywood, FL
Bid Date: Nov 05 2026
Hollywood, FL
Bid Date: Nov 19 2026
Hollywood, FL
Bid Date: Oct 21 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed