Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 10, 2026

Site work and paving for a mixed-use development in Powell, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Removal and replacement of sidewalk, curb and gutter, and driveway asphalt, along with full depth reclamation and paving of the parking area and residential road. Bidding questions shall be submitted on the Public Purchase website by 5:00 p.m. MT on November 23, 2026. Bonds: 10% Bid Bond, Certified Check required. Project Manager: David Williams, david.williamsl@wyo.gov, (307) 777-4642 Question Deadline 11/23/2026 at 5:00 PM MT The Contractor shall remove and replace designated areas of sidewalk, curb & gutter, and asphalt pavement at the Agency's Clark's Fork Hatchery 18 Hatchery Road, Powell, WY 82435 according to the Construction Drawings. Contractor shall: A. Plan and communicate work schedule with Agency representative. B. Maintain access for residents and facility personnel at all times. Saw cut the existing pavement to make an even transition between the new asphalt and existing asphalt not being replaced. Provide survey necessary to perform the work and maintain or enhance the drainage of storm water. For the residential road and parking lot; mill the existing asphalt, work the milled asphalt into the base gravel layer at a depth determined by the engineer, shape to required slopes, and compact. For the residential driveways; remove existing asphalt and recompact the existing base. Any discovered soft spots must be reported to the WGFD Project Manager for approval prior to repair. Areas of Curb and Gutter Removal & Replacement will be determined and marked by WGFD. Lay three to four inches (3-4") of new asphalt over the base gravel layer. The final depth will be determined by the Agency Representative. Hire an independent testing agency to perform materials, compaction, and density testing. Results will be delivered to WGFD Project Manager. Complete the work in a timely fashion and minimize the disturbance to the those living on the facility. The Contractor will coordinate with the Hatchery Superintendent to ensure that access in and out of the facility is maintained Provide a one year warranty

GC Bidding

$900,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed