Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 9, 2026

Renovation of a mixed-use development in San Luis Obispo, California. Completed plans call for the renovation of a military facility.

Replace the failed Computer Room Air Conditioner (CRAC) system in Building 872 with new precision cooling equipment, including demolition, installation of new units and condensers, new refrigerant and electrical systems, controls integration, and commissioning. All questions regarding this IFB MUST be submitted to Lana Ponomarenko at Lana . Ponomarenko@cmd.ca.gov no later than 5:00 PM on 11/16/2026 . Email subject lines must reference IFB No. 133914 . Contractor shall provide all materials, labor, bonds, licenses, insurance, equipment, tools, permits, taxes, transportation, and fees to replace the failed Computer Room Air Conditioner (CRAC) system in Building 872 with new like-for-like precision cooling equipment, including temporary cooling, demolition, installation of new units and condensers, new refrigerant and electrical systems, controls integration, commissioning, and required documentation to restore compliant, continuous cooling for mission-critical communications systems The California Military Department (CMD) requires complete replacement of the computer room airconditioning (CRAC) system in Building 872 to protect California National Guard and California Office of Emergency Services communications and information-technology equipment. Provide a current-production, turnkey precision cooling system, including demolition, installation, commissioning, and final acceptance. Provide the contractor equipment selection, shop drawings, and delegated engineering required by this SOW, together with permits , labor, supervision, equipment, controls, temporary cooling, demolition, disposal , rigging, piping , electrical work, supports , penetrations, firestopping, testing, commissioning, training, warranties, and closeout documentation needed for a complete, operational installation. Independent architectural and engineering services or integrated designbuild services shall be included only under the separately identified statutory authority and procurement method addressed in Section 2.2. Maintain continuous environmental control in the occupied server room. Obtain prior written approval and an approved Method of Procedure (MOP) for any interruption affecting mission equipment. The existing CRAC system has completely failed . Prioritize authorized temporary cooling and restore permanent cooling through the earliest practicable delivery, installation , and commissioning of compliant equipment. shall authorize the public-works procurement and any emergency action under Sections 1.7 through 1.9.

Sub-Bidding

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
482
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2026

January 6, 2027

Project location map

10 Sonoma Ave, San Luis Obispo, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed