Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2026 at 7:00 PM

Updated November 7, 2026

Site work for a road / highway in Red Deer, Alberta. Completed plans call for site work for a road / highway.

The objective of the Signal Infrastructure Replacement Program is to carry out the construction replacement of various intersections throughout the City, with the goal of replacing 5+ signalized intersections a year over the next several years. The scope of work consists of replacing aging traffic signal infrastructure including: bases, steel, traffic cabinet bases, wiring and cables, conduit, tracer wires, pull strings, urds, duct work, traffic signal fixtures, signs, poles, signals and all other components required to replace this infrastructure. This also includes the installation of a new power distribution cabinet between distribution and traffic signal electric works. As a part of the 2027 construction season priorities, the City is looking for construction for full replacement of existing traffic signal infrastructure and lighting at the following locations: 1. 28 Street (Molly Bannister Drive) & 50 Avenue 2. 32 Street & Spruce Drive 3. 43 Street and 55 Avenue 4. 45 Street and 48 Avenue 5. 45 Street and 49 Avenue As a part of the 2027 construction season priorities, the City is looking for construction for partial replacement of existing traffic signal infrastructure and lighting at the following locations: 6. 32 Street and Springfield Avenue - North side of intersection 7. 78 Street and 50 Avenue - Northwest Corner of the intersection Note - these two (2) partial intersections require new bases, steel, conduit, URDs, and signal fixtures, as well as new conductor cable from the signal fixtures to the handholes (with 2.0 m slack). EL&P will complete the installation / termination of the cables, the removals of the existing infrastructure, as well as the remediation of the concrete and asphalt due to the removals. Please refer to the Unit Price Schedule and IFT Drawings for materials and any potential additional scope. Documents can be obtained from https://reddeer.bidsandtenders.ca/ Question Deadline 11/18/2026 at 2:00 PM MT Question submitted to online.

Sub-Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
16
Bidding Soon
247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2026

January 4, 2027

Project location map

Multiple Locations, Red Deer, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed