Published November 25, 2026 at 7:00 PM

Updated November 28, 2026

Renovation of a mixed-use development in San Mateo, California. Completed plans call for the renovation of a swimming pool.

Removal and replacement of swimming pool finishes, lighting, main drains, and stainless steel gutter caps, repairs to portions of the pool deck, upgrades to an outdoor shower for ADA accessibility, installation of detectable warming, painting of loading zones, and relocation of toilet paper dispensers. Estimated Bid Value $1.9M Start/Delivery Date March 31, 2027 Project Duration 4 months Q&A Deadline 12/22/2026 2:00 PM (PST) Communications shall be directed to the District Representative, Andrea Dawson & Veronica Duccini 6D PMCM, however all Pre-Bid RFI's must be submitted through online THE SCOPE OF THE PROJECT INCLUDES: -REMOVE AND REPLACE SWIMMING POOL FINISHES -REMOVE AND REPLACE SWIMMING POOL LIGHTING (52 LIGHTS). -REMOVE AND REPLACE SWIMMING POOL MAIN DRAINS AND STAINLESS STEEL GUTTER CAPS. -REMOVE AND REPLACE PORTIONS OF THE POOL DECK -UPGRADE (1) OUTDOOR SHOWER TO BE ACCESSIBLE - INSTALL DETECTABLE WARNING WHERE REQUIRED - PAINT LOADING AND NON-LOADING ZONES - RELOCATE TOILET PAPER DISPENSERS A. Work comprises to remove and replace swimming pool finishes, remove and replace swimming pool lighting, remove and replace swimming pool main drains and stainless steel gutter caps, remove and replace portions of the pool deck, upgrade (1) outdoor shower to be accessible, install detectable warning where required, paint loading and non-loading zones, relocate toilet paper dispensers located at 1700 West Hillsdale Blvd San Mateo, California 94402. B. Furnish all labor, materials, equipment, services, permits, temporary controls and construction facilities, and all general conditions, seismic requirements, general requirements and incidentals required to complete the Work in its entirety as described in the Contract Documents. The Work includes, but is not necessarily limited to the following: 1 . Provide temporary safety signage and temporary fencing as needed. 2. Construction of main drains, gutters caps, replace portions of pool deck . 3. Furnishing and installation of outdoor shower. 4. Furnishing and installation of detectable warning where required. 5. Electrical upgrades, including: Swimming pool lighting. 6. Coordination with other contractors working at the site and its Subcontractors, coordination with local utility owners and [PG&E] and the District, obtaining necessary permits and complying with permit and environmental conditions, project startup and testing, site restoration and cleanup. C. The Work of this Contract comprises construction of all the Work indicated, described in the Specifications, or otherwise required by the Contract Documents. D. Unless provided otherwise in the Contract Documents, all risk of loss to Work covered by Contract Documents shall rest with Contractor until Final Acceptance of the Work. E. Contractor's use of the premises for Work and storage is limited to the area indicated. F. Contractor shall be solely responsible for all utilities (including without limitation electricity, water, gas, etc.) at the Site. G. Contractor shall carefully remove, in a manner to prevent damage, all materials and equipment specified or indicated to be salvaged and reused or to remain the property of District. Contractor shall store and protect salvaged items specified or indicated to be reused in the Work. a. Contractor may furnish and install new items instead of those specified or indicated to be salvaged and reused, in which case such removed items will become Contractor's property. H. Existing materials and equipment removed by Contractor shall not be reused in the Work, except where so specified or indicated. I. Salvaged items not to be reused in the Work, but to remain District's property, shall be delivered by Contractor in good condition to District at the Facilities Maintenance Center, 1700 West Hillsdale Blvd. Bldg 7, San Mateo. a. Any items specified or indicated to be salvaged which are damaged in removal, storage, or handling through carelessness or improper procedures shall be replaced by Contractor in kind or with new items.

Sub-Bidding

$1,900,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
188
Bidding Soon
3,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2027

March 31, 2027

Project location map

1700 W Hillsdale Blvd, San Mateo, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed