Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 5, 2026 at 7:00 PM
Updated November 7, 2026
Site work and renovation of a fire / police facility in Spanish Fork, Utah. Completed plans call for the renovation of a fire / police facility; and for site work for a fire / police facility.
Reuse, relocate, and extend existing dispatch floor power for 30 new console positions and add power and circuits where needed. Question Deadline 11/17/2026 at 5:00 PM MT to rfp@centralutah911.gov Inventory and document the approximately 22 existing power feeds, floor junction boxes, panels, breakers, UPS and generator sources, circuit identification, available capacity, raised -floor pathways, and conditions affecting reuse. Provide a position-by-position circuit and load plan for the 30 consoles. Identify which existing feeds and junction boxes can be reused or extended with new whips, where new feeds or circuits are needed, and any required panel, breaker, or distribution work. Document capacity limitations. Disconnect and remove unused connections, relocate or extend existing power where suitable, and install new whips from existing floor junction boxes where feasible. Supply additional wiring, feeds, circuits, raceways, boxes, breakers, receptacles, floor connections, and related materials only as needed for a complete installation. Bring dispatch-floor power up from the raised floor at the locations shown in Addendum A. Coordinate exact connection points with the Roy Evans before rough-in and preserve access to raised-floor panels. Provide new wall-mounted electrical power in the Live Training room at the locations shown on the plan in Addendum A. Verify the required receptacle quantities, source types, loads, routing, and available capacity during the site visit; include any new wiring and circuits needed for a complete installation Keep UPS-backed and generator-backed outlets distinctly identified and connected to the correct sources. Do not change an assigned source without written approval. Coordinate any interruption to shared electrical infrastructure with Central Utah 911. The temporary dispatch area and other active operations must remain supported. Obtain required permits and inspections, comply with applicable requirements, and test each outlet for source, voltage, polarity, grounding, and operation. At closeout provide updated panel schedules, an outlet and circuit schedule by console position, as-built routing and source drawings, inspection records, and warranty information.
Sub-Bidding
$450,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2026
January 4, 2027
3047 W 3200 N, Spanish Fork, UT
Related To This Project
Spanish Fork, UT
--
Spanish Fork, UT
Bid Date: Oct 22 2026
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
Bid Date: Oct 15 2026
Spanish Fork, UT
Bid Date: Sep 29 2026
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
Bid Date: Sep 08 2026
Spanish Fork, UT
--
Spanish Fork, UT
--
Spanish Fork, UT
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed