Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 26, 2026 at 7:00 PM
Updated November 27, 2026
Site work, paving and new construction of a mixed-use development in Richmond, Virginia. Working plans call for the construction of a 57,700-square-foot military facility; for site work for a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
***ADDRESS HAS BEEN UPDATED in the LOCATION/LOGISTICS SECTION*** The U.S. Army Corps of Engineers (USACE) Louisville District is issuing this special notice to announce an Industry Day for upcoming construction requirement for Construction of a 300-member Army Reserve Center (ARC) at Defense Supply Center, Richmond, VA. The Louisville District is considering Construction Manager at Risk (CMAR) under 10 USC 2808a Other Transaction Authority for this requirement. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official Request for Qualifications (RFQ) release. LOCATION/LOGISTICS Industry Day Presentation Location: 6090 Strathmore Road (Bldg 70), North Chesterfield, VA 23237 INDUSTRY DAYS USACE intends to conduct an Industry Day on 19 November 2026 at 0900 Eastern Time to provide an overview of the project, potential acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and potential Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official RFQ release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the RFQ. Construction of a 300-member Army Reserve Center (ARC) consisting of a 56,500-square-foot Army Reserve Center and a 1,200-square-foot unheated storage building. Facilities will be designed in accordance with the Army Reserve Design Guide and include all fixtures, furnishings, and equipment. Supporting work includes land clearing, site improvements, exterior lighting, walkways, signage, curbs and gutters, storm drainage, paving, information systems infrastructure, and utility connections. Sustainability, energy-efficiency, and cybersecurity measures are required. The project includes antiterrorism force protection and physical security features, including required standoff distances from roads, parking areas, and vehicle unloading areas. Accessibility for individuals with disabilities will be incorporated. Facilities will be designed for a minimum 40-year service life in accordance with DoD Unified Facilities Criteria 1-200-02, including building envelope performance, integrated building systems performance, and energy-efficiency requirements. Options may include bona fide need collateral equipment. The acquisition is anticipated to use a Construction Manager at Risk (CMAR) approach under Other Transaction Authority. The selected CMAR will provide preconstruction services during active design development and collaborate with the Government and the Designer of Record. Construction activities necessary to complete the project will be added through a later phase, with the Government intending to negotiate a Guaranteed Maximum Price (GMP). The resulting agreement is expected to be firm-fixed-price, with an estimated construction duration of 790 calendar days from the notice to proceed. The Method of Contractor Selection has not been determined at this Time.
Final Planning
$2,000,000.00
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed