Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 25, 2026 at 7:00 PM
Updated November 29, 2026
Site work and new construction of a transportation facility in Pensacola, Florida. Completed plans call for the construction of a transportation facility.
The following individual scopes are intended to be read together with the complete Bid Package 2 ( BP2) Contract Documents and Project Manual. BP2 encompasses architectural work, fire protection, plumbing, HVAC, electrical, safety/security systems, earthwork with exterior improvements, together with the applicable procurement, contracting and general requirements. For each facility, the Contractor shall furnish and coordinate all incidental work reasonably necessary for a complete installation, whether specifically itemized or required by the drawings,specifications, codes, manufacturers' requirements or authorities having jurisdiction. Work shall include required submittals and shop drawings, coordination drawings, testing and balancing, system commissioning, equipment start-up, demonstrations and training, warranties, O& M data and record documents. The Project Manual specifically requires final O&M manuals before Substantial Completion and organization of the manuals by systems, subsystems and equipment. Question Deadline 11/06/2026 at 12:00 PM CT The facility shall include, at a minimum: o Public lobby, vestibules, reception and administrative reception areas; o Call Center; o Radio Room and Dispatch functions; o Safety Manager offices, Chief Safety Officer office, Program Manager office, ADA office and related administrative/support offices; Accounting, Finance, Grants and management offices; Division Manager, Deputy Director, Director and Director's Aide offices; o Conference Room, Meeting Room, and associated presentation areas; o Simulation area; o Breakroom and employee support spaces; . Breakroom and employee support spaces; o Mother's Room and Quiet Room; Men's and women's locker rooms; o Men's, women's and ADA toilet facilities; o Office supplies, janitor, general storage and support spaces; o IT, electrical, mechanical and plumbing support areas; Second- floor Training Room configured for large-group training and presentations; Second-floor storage, restrooms, corridors and mechanical/support areas; o Elevator and stair systems providing vertical circulation between floors; Interior partitions, rated assemblies, ceilings, flooring, wall finishes, millwork, countertops, casework and specialties; o Exterior wall assemblies, glazing, doors, entrances, roof assemblies, flashing, drainage components and associated weatherproofing; Structural foundations, slabs, masonry, structural steel, elevated floor framing, roof framing and associated structural components; o Complete HVAC systems, ventilation, exhaust, controls and associated mechanical equipment; o Domestic water, sanitary waste and vent systems, plumbing fixtures, water heating and associated plumbing specialties; o Automatic fire sprinkler/fire-protection systems and associated fire-protection equipment; o Complete electrical service and distribution, panelboards, branch circuitry, receptacles, equipment connections, interior and exterior lighting, emergency lighting, exit signage, grounding, lightning protection and associated controls; Fire alarm and life-safety systems; Telecommunications pathways, cabling infrastructure, MDF/IDF infrastructure and equipment connections; Access-control infrastructure, card readers, electric locking interfaces, door contacts, request-to-exit devices and associated security systems; Interior and exterior CCTV infrastructure and cameras as indicated; Mass-notification/paging infrastructure and associated speakers; Code Blue/emergency communication infrastructure where indicated; Digital signage and transit-message-board infrastructure where indicated; Audio/visual infrastructure for the Training Room, Conference Room and Meeting Room, including floor boxes, presentation connections and associated pathways as indicated in the Contract Documents; and All other architectural , structural , mechanical , electrical , plumbing, fire protection, technology, communications, and specialty work necessary for a complete Administration Building. This project is to provide construction services to build five structures (Administration Building, Maintenance Building, Passenger Terminal Transfer Center, Bus Wash, and Fuel Station) along Clarinda Lane in Pensacola, Florida
Bid Results
$15,462,845.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2026
January 25, 2027
Clarinda Ln, Pensacola, FL
Related To This Project
Pensacola, FL
Bid Date: Dec 09 2026
Pensacola, FL
Bid Date: Nov 20 2026
Pensacola, FL
Bid Date: Nov 20 2026
Pensacola, FL
Bid Date: Nov 25 2026
Pensacola, FL
Bid Date: Nov 20 2026
Pensacola, FL
Bid Date: Nov 20 2026
Pensacola, FL
Bid Date: Nov 20 2026
Pensacola, FL
Bid Date: Dec 09 2026
Pensacola, FL
Bid Date: Dec 03 2026
Pensacola, FL
Bid Date: Dec 04 2026
Pensacola, FL
Bid Date: Dec 07 2026
Pensacola, FL
--
Pensacola, FL
--
Pensacola, FL
--
Pensacola, FL
Bid Date: Nov 13 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed