Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 18, 2026

Renovation of an educational facility in Camden Point, Missouri. Completed plans call for the renovation of a educational facility.

Upgrade and replacement of doors at the North Platte R-I School District campus. Removal and disposal of 5 existing door entryways ? Furnish and Install new double door entryway systems with the following approx. dimensions: ? 1st Grade - 104” W x 96” H ? Kindergarten - 112” W x 96” H ? Playground - 78” W x 96” H ? 2nd Grade - 78” W x 96” H ? PreSchool - 180” W x 96” H ¦ Full height steel doors with 22” x 34” pane of 1” insulated tempered glass ¦ Utilize (4) existing electronic strike plate on one specified door ¦ Utilize existing KeyMark key cylinder (1 on each entryway) ¦ Install electronic strike plate on PreSchool entryway door ¦ Include hinge, rim exit, pull, hold open closure, sweep and threshold ¦ Removable mullion installed between doors ¦ Steel Frame: 1” insulated tempered glass w/ steel bottom panel ¦ Primed and Painted (color TBD by school) ? Coordinate with electrical and/or security contractors ? Caulk and Seal around all entryways ? Test and verify proper equipment operation with building owner

Post-Bid

$250,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
72
Bidding Soon
1,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

June 1, 2027

Project location map

300 Scout St, Camden Point, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed