Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 11, 2026 at 7:00 PM
Updated November 13, 2026
Renovation of an educational facility in Regina, Saskatchewan. Completed plans call for the renovation of a educational facility.
The Regina Public School Division intends to engage a Construction Manager to provide pre-construction and construction services for the demolition and reconstruction of the Campbell Collegiate Vocational Wing and associated renovations to the adjacent facility. The Construction Manager will be responsible for providing leadership and coordination of all construction activities, including constructability reviews, cost planning and control, schedule development and management, procurement of trade packages, site logistics, safety management, quality control, and stakeholder coordination within an operational school environment. The Project will be delivered through a phased approach to maintain continuity of school operations and will include significant scope related to hazardous material abatement, selective demolition, new construction, and renovation. The Construction Manager is expected to work collaboratively with the Owner and design team to proactively manage risk, mitigate schedule and cost impacts, and ensure successful delivery of the Project in accordance with the approved scope, budget, and timeline. Construction activities are anticipated to commence in early May 2027, subject to regulatory approvals and completion of pre-construction activities. During the pre-construction phase, the Construction Manager is responsible for actively supporting design development, risk mitigation, cost certainty, and constructability of the Project through direct involvement in planning, analysis, and coordination activities. The Construction Manager shall complete structured multidisciplinary reviews of all design documentation at each specified design milestone and shall issue written constructability review reports identifying construction risks, sequencing constraints, interface issues between trades, and opportunities to optimize construction methodology. These reviews shall explicitly address demolition and abatement logistics, access and laydown limitations, site safety considerations, and the constraints associated with delivering the Project within an occupied educational facility. For further clarity constructability reviews and Construction Cost Estimates, as described in Schedule A1 Pre Construction Services of Appendix E Form of Agreement, shall be provided separately for each of the following Work packages, and for any other Work packages agreed to with the Owner; a. Work package #1: Existing mechanical and electrical relocation/modernization, abatement, and demolition of existing vocational wing. Constructability review and Class B Construction Cost Estimate (+/- 10%) when Construction Documents are 75% complete. Constructability review and Class A Construction Cost Estimate (+/- 5%) at the end of Construction Documents Phase. b. Work package #2: Reconstruction of vocational wing and renovation of existing spaces. Constructability review and Class B Construction Cost Estimate (+/- 10%) when Construction Documents at 75% complete. Constructability review and Class A Construction Cost Estimate (+/- 5%) at end of Construction Documents Phase. Documents can be obtained from https://rbesk.bonfirehub.ca/opportunities/113217 Questions Due Date: Nov 18th 2026, 2:00 PM CST online submission.
GC Bidding
$1,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 27, 2026
May 1, 2027
102 Massey Rd, Regina, SK
Related To This Project
Regina, SK
Bid Date: Nov 18 2026
Regina, SK
Bid Date: Dec 08 2026
Regina, SK
Bid Date: Nov 27 2026
Regina, SK
Bid Date: Nov 19 2026
Regina, SK
Bid Date: Nov 13 2026
Regina, SK
Bid Date: Nov 23 2026
Regina, SK
Bid Date: Dec 01 2026
Regina, SK
Bid Date: Dec 01 2026
Regina, SK
Bid Date: Nov 17 2026
Regina, SK
Bid Date: Nov 30 2026
Regina, SK
Bid Date: Nov 20 2026
Regina, SK
Bid Date: Nov 20 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed