Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 7, 2026

Renovation of a mixed-use development in Saginaw, Michigan. Working plans call for the renovation of a medical facility.

Furnish all tools, equipment, materials, permits, labor, supervision, and other resources necessary to replace portions of the existing campus water loop piping and existing campus water loop isolation valves. The work includes installation of a new water booster pump powered by a new equipment branch of emergency power in Building 22. To support the new emergency power branch, new wiring will be installed from Building 19 (generator building) through an existing underground conduit to Building 22, feeding a new emergency power distribution panel that will replace the existing panel that does not meet code requirements. The project also requires installation of a new automatic transfer switch, panelboard, associated wiring, and conduits to establish the new equipment branch of emergency power. Construction activities will impact existing asphalt roadways, parking lots, concrete sidewalks, and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as indicated on the drawings and restore all disturbed landscaping and lawn areas. Because the existing campus water loop piping is located beneath roadways and sidewalks, and much of the new piping will be installed in similar areas, the work shall be completed in phases to maintain campus access for employees and Veterans and to preserve water service until building service tie-ins are performed. Any required water service shutdowns must be coordinated with the Contracting Officer's Representative (COR). The period of performance is 300 calendar days from receipt of the Notice to Proceed. The Method of Contractor Selection has not been determined at this Time.

Final Planning

$400,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
112
Bidding Soon
1,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2027

Project location map

1500 Weiss St, Saginaw, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed