Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 26, 2026 at 7:00 PM

Updated November 28, 2026

Site work, paving and renovation of a mixed-use development in San Antonio, Texas. Completed plans call for the renovation of a road / highway; sidewalk / parking lot; for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

Street reconstruction, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls, speed humps, topsoil, sodding, signage, pavement markings, and utility adjustments. Question Deadline 11/24/2026 at 4:00 PM CT Questions are to be submitted in writing in the Questions and Answers section on online Construction may include but is not limited to street reconstruction, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls combination-type, speed humps, topsoil , sodding, signage, pavement markings installation, adjusting existing valve boxes and manholes, and any other items required due to the site conditions to accomplish the project scope. Project construction may include but is not limited to: street reconstruction to include excavation, subgrade proofrolling and treatment, installation of hot mix asphaltic base and surface courses, concrete pavement, flexible base course, concrete curbs, sidewalks, curb ramps, driveways, retaining walls, mailbox relocations, topsoil and sodding, pedestrian rail , signage and striping , tree removal and installation, speed humps, seal coat and underseal course, and minor utility adjustments to include adjustment of existing valve boxes, relocating customer shutoff valves, backflow preventers and pressure reducing valves, existing meter and meter box relocation, short and long service relays, fire hydrant relocations, adjusting existing manholes and sanitary sewer cleanouts, and manhole reconstructions

GC Bidding

$10,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
98
Bidding Soon
2,669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2026

February 9, 2027

Project location map

Multiple Locations, San Antonio, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed