Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2026 at 7:00 PM

Updated November 15, 2026

Site work and renovation of a bridge / tunnel in Heber City, Utah. Completed plans call for the renovation of a bridge / tunnel.

Replacement of existing fiber with 72-strand fiber optic cable in 1,805 linear feet of existing conduit, including replacement of four junction boxes. Furnishing and installation of 30,300 linear feet of 48-strand fiber optic cable in a 8.5-foot diameter concrete tunnel with penetrations at the Strawberry Tunnel Turnout and Syar Tunnel Westgate Control structures.

GC Bidding

$950,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
67
Bidding Soon
1,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2027

October 25, 2027

Project location map

Multiple Locations, Heber City, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed