Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 11, 2026 at 7:00 PM
Updated November 17, 2026
Site work and new construction of a civil project in West Palm Beach, Florida. Completed plans call for the construction of a water / sewer project; and development.
Construction of a replacement pilot seawall and adjacent living shoreline elements along the west shoreline of the Atlantic Intracoastal Waterway. The scope of work for the Northern Seawall Segment (Sta. 0+00 to Sta. 2+82) includes concrete cap demolition, disposal , and temporary riprap removal to facilitate the installation of 282 LF of steel sheet pile bulkhead. The steel sheet pile bulkhead includes a fiber-reinforced polymer (FRP) reinforced concrete cap and concrete fascia. The upland of the bulkhead requires demolition and disposal to facilitate sidewalk repairs. The City of West Palm Beach ("City") is accepting bids from experienced, qualified and responsible Contractors to furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, equipment, machinery, tools, transportation, delivery, disposal of waste and surplus material, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other appurtenances and incidentals necessary for the furnishing, performance, testing, start-up and successful completion of the Work as shown on the Construction Drawings set forth in Exhibit A and associated Technical Specifications set forth in Exhibit B, including the costs for all supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control , security, miscellaneous costs, warranties, general conditions, overhead and profit for the complete and proper installation of the Work. Funds for this project are partially derived from a State of Florida, Department of Environmental Protection, Grant Agreement (#22SRP63) and therefore the successful Contractor must comply with grant requirements The Project is located along South Flagler Drive in West Palm Beach, Florida, and is divided into two segments: the Northern Segment and the Southern Segment. Question Deadline 11/19/2026 Question Deadline 11/19/2026 Question submitted to :City of West Palm Beach Procurement Division - 5th Floor 401 Clematis Street - City Hall West Palm Beach, FL 33401 Sharon Sepulveda, Procurement Supervisor Email: procurement@wpb.org Direct: 561.494.1056 Main: 561.822.2100 TTY: 800.955.8771
GC Bidding
$500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2026
January 14, 2027
S Flagler Dr, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: Dec 21 2026
West Palm Beach, FL
Bid Date: Jan 07 2027
West Palm Beach, FL
Bid Date: Jan 07 2027
West Palm Beach, FL
Bid Date: Jan 05 2027
West Palm Beach, FL
Bid Date: Jan 05 2027
West Palm Beach, FL
Bid Date: Dec 29 2026
West Palm Beach, FL
Bid Date: Nov 24 2026
West Palm Beach, FL
Bid Date: Dec 17 2026
West Palm Beach, FL
Bid Date: Nov 24 2026
West Palm Beach, FL
Bid Date: Dec 16 2026
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Nov 20 2026
West Palm Beach, FL
Bid Date: Dec 16 2026
West Palm Beach, FL
Bid Date: Dec 03 2026
West Palm Beach, FL
Bid Date: Dec 16 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed