Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 17, 2026 at 7:00 PM

Updated November 23, 2026

Renovation of a municipal facility in Borden-Carleton, Prince Edward Island. Completed plans call for the renovation of a municipal facility.

The Contractor shall supply all materials, labour and equipment required to complete the scope of work outlined in this section for the Borden B Exterior Upgrades - Windows, Doors, Siding, Insulation, Roofing and Eavestrough Replacement Housing project located at 188 Howatt St, Borden-Carleton C0B 1X0 The Contractor shall complete the following exterior upgrades: Obtain all required measurements and verify accuracy prior to ordering. Successful bidder must submit three sets of shop drawings of windows and doors and have approved prior to ordering. Perform all work in accordance with applicable building codes. Remove existing interior and exterior window and door trim, vinyl siding, soffit, vents and all other removals required to complete the work. Remove existing doors and windows. Ensure proper notice is provided prior to removing windows and doors in occupied units. Replace all doorbell buttons, light fixtures, receptacles (install GFCI with covers), hose bibs, vents/vent covers, mailboxes etc. Remove gable vent - sheath and waterproof hole. Inspect existing buildouts, exterior sheathing, and rough openings, and notify Government of any signs of rot or water damage prior to installing new. Install new 1" wood buildouts around all window and door rough openings for window securement. Install 1 " Ener-Air rigid insulation on exterior walls c/w sealed joints as per manufacturer's recommendations. Install Tyvek (or approved equivalent) vapour barrier over insulation. Install window and door wrapping for all openings in accordance with manufacturer's specifications and or industry best practices . Ensure new window and door wrapping ties into the new vapour barrier as required. Install new triple pane single-hung vinyl windows. Install new doors including standard lever style handles c/w deadbolts. Install new sliding patio doors in each unit. Install window and door flashing as per manufacturer recommendations and or industry best practices. 1Install new vinyl siding complete with standard trim and accessories. Install new fascia and soffit with minimum 25% vented, c/w attic vents, ensuring that building codes are followed for location of venting. Install new eavestrough, downspouts and splash pads graded away from the building. Install 8" waterboard around perimeter of building with drip cap and flashing on board to cover the rigid foam insulation. Build out interior jambs for all windows and doors with 3/4 " finger jointed pine to interior wall finish. Repair walls as required. Insulate void between window / door jambs and rough studs with low expandable foam as per manufacturer's instructions, and repair drywall where required. Install pre-primed 3 - 1/2 " pine casing on all four sides of windows and all three sides of doors. Fill trim nail holes and apply one coat of latex primer and two coats of latex finish paint. Ensure all new windows and doors are operational after installation and make any required adjustments or corrections. For any grassed areas damaged during the Work, install screened topsoil and sow with grass seed c/w 2' stakes, string, and red plastic ribbon to protect new seed. Roofing upgrades: a. Remove existing starter strip on rake and eaves. Notify Government of any rot or damage on exposed framing and prior to installing new finishes. b. Install new metal starter strips extending no more than 1 " over eave edge for proper water runoff into existing gutters. C. Remove terminated exhaust vent covers (8) - sheath and waterproof holes. Secure or remove any associated ducting in the attic if necessary. d. Install new metal roofing material over existing asphalt roof, including: a. Roof Strapping installed over existing asphalt roofing. Strapping to be spaced at 16" on center on main area of roof. Fill in strapping along rakes, around protrusions, in valleys, and other locations as required to properly secure roofing material ensure strapping is in the same plain as the primary strapping. Include additional strapping to properly secure snow guards; confirm placement with government employees prior to installation. Screws to be fastened to existing wood rafters (two (2) screws per connection point), spaced at 24" on center. Countersink screws into wood strapping a minimum of 1/16". Nailing is not acceptable. - b. Metal Starter - Install 4" metal starter stripping on all eaves and 2" metal starter stripping up rakes. Colour to match roof metal. c. Vents - Install vent flashing over all vent pipes as per manufacturer's recommendations. d. Metal Roofing - Installed as per manufacturer's instructions for fastening and lapping, using coloured headed screws matching metal roofing material, and fastened at every run of strapping. Install fitted foam on bottom edge of metal panels along eave line. Roofing panels must be full length to match the size of the roof; overlapping sheets vertically is not acceptable. e. Metal Screws -Tighten screws as not to dimple metal roofing. Screws are to be 2" in length. Screws should be straight and not be loose or overtightened. f. Roof Cap - Install breathing strips on both sides of ridge line on metal roof. Install 12" metal ride cap using coloured headed screws . Ensure roof sheathing is cut on each side to allow for ventilation to take place and notify Government if any sheathing modifications are required. - g. Valleys Install 20.5" valley flashing bent to fit valley. Install metal roof panels over valley flashing with a foam fitted stripped under edge of metal panels on the valley flashing. All valley flashing to be constructed out of same material as roofing panels in gauge and colour. h. Snow Guards - Install one run of continuous snow guards on all roof sides attached as per manufacturer's recommendations. Blocking to be installed to ensure sound connection. Confirm snow guard placement with Government prior to installation. Clip style snow guards are not acceptable. Universal Sidewall and End Wall Flashing: i. Wall Flashing - To be installed as per manufacturer's - recommendations and made of the same gauge and colour as metal panels. Siding on sidewalls must be taken off and reinstalled. ii. Flashing and Starter Strip - Flashing around flue with metal, and starter strip is to be coloured to match metal roofing. Install foam on bottom edge of metal panel sheets along eaves. All flashing to be installed as per manufacturer recommendation. - iii . Caulking - Caulk around any protrusions, pipes, etc. Caulking to match roof colour. j . Warranty provide standard manufacturer's warranty upon completion of the work. CONTACT INFORMATION About the good or service: Name: Brad Gordon E-mail: bradgordon@gov.pe.ca About the procurement process: Procurement Officer: Melanie Barlow E-mail: mcbarlow@gov.pe.ca

Post-Bid

$450,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
13
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2026

January 1, 2027

Project location map

188 Howatt St, Borden-Carleton, PE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed