Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2026 at 7:00 PM

Updated November 18, 2026

Site work and addition to an educational facility in Mount Vernon, Washington. Completed plans call for the addition of a educational facility; and for site work for a educational facility.

Building addition for the Skagit Valley College Fire Technology program. Question Deadline 11/30/2026 at 1:00 PM PT Online Portal (32.9900 ac) PARCEL 'D' OF SURVEY RECORDED UNDER AF#200906040082 AKA THE SOUTHWEST 1/4 OF THE NORTHWEST 1/4 OF SECTION 16, TOWNSHIP 34 NORTH, RANGE 4 EAST, W.M., EXCEPT THAT PORTION THEREOF LYING WITHIN SECONDARY STATE HIGHWAY I-G (NOW KNOWN AS COLLEGE WAY, SR-538) AND ALSO EXCEPTING THEREFROM TEH WEST 30 FEET FOR EXISTING COUNTY ROAD. ALSO, EXCEPTING THAT PORTION CONDEMNED FOR SR 538 IN SKAGIT COUNTY SC 30485, DESCRIBED AS FOLLOWS: THAT PORTION OF THE SOUTHWEST 1/4 OF THE NORTHWEST 1/4 OFOF SECTION 16, TOWNSHIP P 34 3 NORTH, RANGE 4 EAST, W.M., LYING SOUTHERLY AND WESTERLY OF A LINE DESCRIBED AS FOLLOWS: BEGINNING ON THE CENTERLINE OF SR 538 HP 1.13 TO HP 1.41 MOUNT VERNON; LAVENTURE ROAD INTERSECTION AT HIGHWAY ENGINEER'S STATION 60+00.0; THENCE NORTH 0 DEGREES 32 EAST 30.00 FEET; THENCE NORTH 89 DEGREES 28 WEST 550.00 FEET; THENCE WESTERLY 102 FEET, MORE OR LESS, TO A POINT THAT BEARS NORTH 0 DEGREES 32' EAST 50 FEET FROM HIGHWAY ENGINEER'S STATION 53+50 ON SAID CENTERLINE; THENCE NORTHWESTLY 30 FEET, MORE OR LESS, TO INTERSECT THE EASTERLY BOUNDARY OF EXISTING COUNTY ROAD AT A POINT 75 FEET DISTANT NORTHERLY MEASURED AT RIGHT ANGLES FROM SAID CENTERLINE; THENCE WESTERLY PARALLEL WITH SAID CENTERLINE, 60 FEET TO A POINT, AND THE END OF THIS LINE DESCRIPTION. ALSO, EXCEPTING THEREFROM, THE FOLLOWING DESCRIBED TRACT: BEGINNING AT THE NORTHWEST CORNER OF SAID SOUTHWEST 1/4 OF THE NORTHWEST 1/4; THENCE EAST A DISTANCE OF 376.7 FEET; THENCE SOUTH A DISTANCE OF 208.7 FEET; THENCE WEST A DISTANCE OF 168 FEET; THENCE SOUTH A DISTANCE OF 104.35 FEET; THENCE EAST A DISTANCE OF 168 FEET; THENCE SOUTH A DISTANCE OF 104.35 FEET; THENCE WEST A DISTANCE OF 346.7 FEET, MORE OR LESS, TO THE EAST LINE OF THE RIGHT-OF-WAY OF LAVENTURE ROAD; THENCE SOUTH 58 FEET, MORE OR LESS, TO A POINT 844.33 FEET NORTH OF THE SOUTH LINE OF SAID SOUTHWEST 1/4 OF THE NORTHWEST 1/4; THENCE EAST A DISTANCE OF 178.7 FEET; THENCE SOUTH A DISTANCE OF 313.05 FEET; THENCE WEST A DISTANCE OF 178.7 FEET, MORE OR LESS, TO THE EAST LINE OF THE RIGHT-OF-WAY OF LAVENTURE ROAD; THENCE SOUTH A DISTANCE OF 104.35 FEET; THENCE EAST A DISTANCE OF 178.7 FEET; THENCE SOUT A DISTANCE OF 104.35 FEET: THENCE WEST TO THE WEST LINE OF SAID SOUTHWEST 1/4 OF THE NORTHWEST 1/4; THENCE NORTH TO THE POINT OF BEGINNING. ALSO EXCEPTING THAT PORTION OF THE SOUTHWEST 1/4 OF THE NORTHWEST 1/4 OF SECTION 16, TOWNSHIP 34 NORTH, RANGE 4 EAST, W.M., DESCRIBED AS FOLLOWS: BEGINNING AT A POINT WHICH IS 313.05 FEET SOUTH AND 208.7 FEET EAST OF THE NORTHWEST CORNER OF SAID SUBDIVISION; THENCE EAST 168 FEET; THENCE NORTH 104.35 FEET; THENCE WEST 168 FEET; THENCE SOUTH 104.35 FEET TO THE POINT OF BEGINNING. SITUATE IN THE COUNTY OF SKAGIT, STATE OF WASHINGTON. Estimated MACC for Base Bid : $705,000.00 to $780,000.00 If you have questions, please contact the Project Manager, Kevin Barber, via email at kevin.barber@des.wa.gov or by phone at (360) 628-6417 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project The Project consists of a new fire apparatus bay addition to SVC Fire Technology Building. Scope of work is indicated on the contract drawings and specifications. It generally consists of: 1. Design and construction of a new 42' x 24' pre-engineered metal building structure to match existing building. 2. Exterior walls, exterior hollow metal door, and sectional overhead apparatus bay door. Engineering and support for the future addition to the pre-engineered metal structure. 4. 5. Limited site demolition and modification of the existing structure to accept new pre-engineered metal building. New concrete footings, foundations, and sloped slab-on -grade per the structural drawings. 6. New concrete parking apron, excavation, grading, paving, and miscellaneous sitework per civil drawings. 7. New oil/water separator, grinder pump, and sanitary force main piping. 8. New plumbing systems including domestic water piping, hose bibbs, trench drains, and sanitary piping. 9. New mechanical work including vent hoods, exhaust fans, unit heaters and vehicle exhaust extraction systems. 10. Electrical work including lighting, power distribution, low-voltage, and fire alarm systems. 11. Rough-ins and pathways for future equipment to be installed by others as indicated on the drawings.

GC Bidding

$780,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
130
Bidding Soon
2,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed