Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 21, 2026

Site work and addition to an educational facility in College Station, Texas. Completed plans call for the addition of a educational facility.

Expansion of room 108 at the Dwight Look Engineering building. Work to be done: The work to be performed under this contract and in accordance with these contract documents shall consist of furnishing all necessary plant, labor, materials, and constructing, installing, and performing all work shown and described in the contract documents, all of which are made a part thereof. The demolition phase includes removal of existing reception furniture, file cabinets, and equipment by Owner. Contractor is to remove a portion of the existing existing carpet tiles in the main student gathering lobby. The existing storefront glazing system is to be salavaged for reinstallation. Limited ceiling demolition of light fixtures and supply air devices. The scope of new construction work for Suite 108 shall include, but not be limited to, the construction of a large reception area, two new offices and a storage room. The demising wall in the lobby will be a full height wall. New interior demountable window wall systems shall match the existing office standard. All new demountable office doors shall be provided with building standard lockset and factory supplied door hardware. The reception area and new office will have new 2x2 ceiling grid and tiles at a 9'-0" height. The HVAC scope of work shall include the relocation of existing air grilles, installation of new flexible ductwork as required, and the installation of new air distribution devices. Several existing light fixtures shall be removed and turned over to the Owner. Refer to the drawings for the location and requirements of all new electrical and data devices. Question Deadline 11/25/2026 at 5:00 PM CT Questions regarding the proposal process should be directed: Mitchell Hedstrom, Project Manager Mitchell.Hedstrom@sscserv.com, (979) 436-7106 Inquiries regarding the technical aspects of the Construction Documents shall be directed to: Tom Dearborn PDG Architects tvdearborn@pdgarchitects.com 713-629-6100

GC Bidding

$1,800,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
131
Bidding Soon
4,307
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2026

December 20, 2027

Project location map

To Be Determined, College Station, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed