Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 21, 2026

Site work and new construction of an educational facility in Upper Dublin Township, Pennsylvania. Completed plans call for site work for a educational facility; and for the construction of a educational facility.

Construction will be bid for the following Work Scopes. Work Scope No. 2: Electrical Construction Construction Phase 1 New Building Substantial Completion: June 20, 2029 Construction Phase 2 Demo & Sitework Substantial Completion: February 27, 2030 Final Completion: March 31, 2030 The Work of the Project is defined by the Contract Documents and includes, but is not limited to, the following: New building construction Environmental Abatement (to be completed under a separate prime contract) Demolition Associated site work Work Scope 2 -Electrical Construction a. Work Scope No. 2 includes all labor, materials, equipment, supervision, coordination, services, and incidental work required to provide the complete construction of the building and associated improvements as shown in the Contract Documents. The Specification Divisions specifically assigned to this Contract are Divisions 00, 01 , 02, 03, 04, 07, 08, 10, 11 , 12, 14, 22, 23, 26, 27, 28, 31 and 33 except when specifically assigned to another Contract for construction. The Electrical Construction Contract shall also perform all work shown, specified, indicated, scheduled, or reasonably inferable from the Contract Documents necessary for a complete and functional installation, regardless of the drawing discipline, specification section , drawing sheet designation, or detail in which the work is referenced, except where expressly assigned to another Contract. Work Scope No. 2 includes all construction and other activities customarily recognized as electrical construction. Question Deadline 11/26/2026 Questions received less than five (5) days prior to the date for opening of Bids may not be answered. All questions must be sent to: ALLOY5, LLC. Jamie Bortz, jbortz@alloy5.com

Sub-Bidding

$47,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,189
Active Projects
402
Bidding Soon
6,945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2026

February 3, 2027

Project location map

1520 Limekiln Pike, Upper Dublin Township, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed