Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 17, 2026 at 7:00 PM

Updated November 24, 2026

Site work and new construction of a military facility in Dania Beach, Florida. Conceptual plans call for the construction of a three-story above grade military facility; and for site work for a military facility.

The USCG Station Fort Lauderdale Reconfiguration project includes abatement and demolition of existing Coast Guard facilities, including pile foundations, sheet pile bulkheads, and associated site features. The work includes excavation, dredging, removal, repositioning, and disposal of existing soils, including contaminated soils containing fuel- or paving-related contaminants requiring off-site disposal in accordance with state and federal regulations. Construction includes a new three-story multi-mission facility of approximately 36,000 gross square feet, a separate one-story boathouse of approximately 5,000 gross square feet, a 17-foot by 20-foot outdoor covered area at the armory entrance, and a 30-foot by 50-foot outdoor covered fitness area. The project also includes construction of a boat basin with a steel sheet pile seawall, bulkhead walls, a covered boat mooring area, and floating boat slips. Prior to demolition, the contractor shall provide a temporary turnkey provisional facility at Port Everglades Berth 28 consisting of six complete pre-engineered relocatable building units. Work includes installation of the relocatable facilities, utility connections, furnishings, relocation of station operations, maintenance of the provisional facility during the performance period, and non-personnel commercial moving services. Upon completion of the permanent facility, the contractor shall relocate Coast Guard operations back to the new station, remove all provisional facilities and site features, and restore the temporary site to its pre-construction condition. The anticipated contract is a firm-fixed-price design-build construction project with an estimated magnitude between $100,000,000 and $250,000,000. Location: USCG Station Fort Lauderdale, Fort Lauderdale, Florida, and Port Everglades Berth 28, Fort Lauderdale, Florida. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$250,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
119
Bidding Soon
1,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2027

Project location map

7000 N Ocean Dr, Dania Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed