Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 22, 2026

Site work and renovation of an educational facility in Oxford, Ohio. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Replacement of the battery bank for the UEA SH4 system. Question Deadline 11/20/2026 at 2:00 PM ET Questions regarding this proposal shall be emailed to Joel Fellman and Cory Dorton a. fellmajl@miamioh.edu b. dortonc@miamioh.edu Isolate Battery Bank #1 (BB-1), coordinate with MU PM . Disconnect and remove the isolated battery bank, charger, and existing racking. Salvage existing wiring and power for charger for reuse. Contractor to skid old batteries one layer high for recycling by MU PM . Reuse skids from new equipment. Provide and install the equipment listed above and all associated material as required to put BB-1 back into service. Once BB-1 is complete, coordinate with MU PM to switch over power to new BB- 1 and isolate/remove from service BB-2. 5. Provide same scope for BB-2 as listed in items 1-3 above. 6. Provide all deliverables as required. Testing: Each battery bank and corresponding charger shall undergo acceptance testing per IEEE, NETA and manufacturer's specifications. Testing shall include a capacity discharge test performed in accordance with IEEE 1106-2015 and manufacturer's specifications. Any deficiencies found shall be corrected by the contractor and re-testing shall be performed as required. (See Deliverables below) Notes: 1. Alternates may be submitted and approved during the bidding phase and shall be equal to or higher quality than the equipment as listed in the Basis if Design . Equipment shall be 100% compatible as a complete and operating system. Alternates MUST be approved in writing by the MU PM 5 days prior to bid due date.

Sub-Bidding

$450,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
132
Bidding Soon
2,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

January 4, 2027

Project location map

501 E Spring St, Oxford, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed