Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 18, 2026 at 7:00 PM
Updated November 24, 2026
Renovation of a mixed-use development in Detroit, Michigan. Working plans call for the renovation of a medical facility.
Renate existing space on the first floor of the John D. Dingell VA Medical Center to create an X-Ray room, control room, changing space, possible bathroom, and refurbished waiting/check-in area. The renovation area is approximately 1,244 square feet and includes rooms C1660, CC156, C1695, C1692, C1693, C1694, C1695, C1696, and CC157. Existing changing areas, hallways, waiting spaces, and a bathroom will be demolished and reconfigured to support the new layout. Provide all necessary electrical, mechanical, and architectural construction, including lead-lined walls, flooring, and ceilings. The work also includes refurbishment of the adjacent waiting room and check-in area affected by the renovation. All work must be performed without disruption to Medical Center operations and in compliance with manufacturer recommendations, applicable codes, VA standards, and VA Detroit building standards. Provide all required construction and safety barriers, temporary dust partitions, temporary gypsum board partitions, fire-retardant plastic sheeting, walk-off mats, submittals, and shop drawings for approval. Order and stage all materials and equipment on-site before beginning demolition. Fully document all work performed throughout the project. Utility shutdowns will be conducted outside normal working hours, and any work outside approved hours must receive prior authorization. The period of performance is 180 days. Location: John D. Dingell VA Medical Center, 4646 John R Street, Detroit, MI 48201. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
$1,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2027
4646 John R St, Detroit, MI
Related To This Project
Detroit, MI
Bid Date: Dec 17 2026
Detroit, MI
Bid Date: Dec 22 2026
Detroit, MI
--
Detroit, MI
Bid Date: Nov 30 2026
Detroit, MI
Bid Date: Dec 09 2026
Detroit, MI
Bid Date: Dec 04 2026
Detroit, MI
Bid Date: Jan 15 2027
Detroit, MI
Bid Date: Dec 09 2026
Detroit, MI
Bid Date: Feb 02 2027
Detroit, MI
Bid Date: Dec 01 2026
Detroit, MI
Bid Date: Dec 04 2026
Detroit, MI
Bid Date: Dec 15 2026
Detroit, MI
Bid Date: Dec 09 2026
Detroit, MI
Bid Date: Nov 09 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed