Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 21, 2026 at 7:00 PM
Updated November 23, 2026
Site work and new construction of a power facility in Bryan, Texas. Completed plans call for the construction of a power facility.
It Is The Intent Of These Specifications And Drawings To Provide The Contractor With The Scope And General Requirements For The Construction Of The Tabor To 138kv Interconnection Project. The Existing Line, Sam Rayburn To Tabor Is A 69-kilovolt (kv) Transmission Line. The New Line, Tabor Substation , Is A 138-Kilovolt (kv) Line. Both Are Located In Brazos County. The Customer Site Will Be Located Immediately Southeast Of Tabor Substation , Fronted On Boatcallie Rd, And The Customer Will Take Service At 138kv. The New 138kv Tabor Substation Transmission Line Will Be Designed And The Existing 69kv Tabor To Sam Rayburn Will Be Relocated To The Southside Of Boatcallie Rd. The New Line Will Take Off From A New Tabor Substation Transmission Line Terminal And End At A Point Of Interconnect Deadend Outside Of The Customer Facility. The New Transmission Structures Are Designed To Support One Circuit Of Bundled 1033.5 Kcmil Acss curlew Conductor And One New Dno 11938 Opgw. One (1 ) 3/8 Ehs 7-strand Steel May Be Used At Each Substation For The Purposes Of Additional Lightning Protection , See Phasing Diagram For Additional Information . The Existing Single 1033.5 Kcmil Acsr curlew Conductor Supported On Existing Concrete Tangent Structure, Shielded By Existing Opgw Will Be Utilized Between New Deadend Structures. The Existing Single Phase Distribution Circuit Will Be Underbuilt On This Transmission Line. Interconnection project between Tabor and 138kV system. Question Deadline 12/30/2026 at 3:00 PM CT
GC Bidding
$3,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2027
March 15, 2027
6590 FM974, Bryan, TX
Related To This Project
Bryan, TX
Bid Date: Dec 17 2026
Bryan, TX
Bid Date: Jan 06 2027
Bryan, TX
Bid Date: Nov 16 2026
Bryan, TX
--
Bryan, TX
Bid Date: Dec 09 2026
Bryan, TX
Bid Date: Dec 22 2026
Bryan, TX
--
Bryan, TX
Bid Date: Jan 06 2027
Bryan, TX
Bid Date: Nov 18 2026
Bryan, TX
Bid Date: Nov 23 2026
Bryan, TX
--
Bryan, TX
--
Bryan, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed