Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 24, 2026

Site work and renovation of a data center facility in East Lansing, Michigan. Completed plans call for the renovation of a data center facility.

This project involves replacing the chilled water system chillers at the Computer Center. Work includes removing the three existing roof-mounted air-cooled chillers, dry cooler, chilled water pumps, expansion tank, air separator, and glycol feed system with associated piping, controls, and wiring, and installing two new 30-ton air-cooled scroll chillers and a new dry cooler on new roof support steel; three new base-mounted chilled water pumps with variable frequency drives; a new expansion tank, air and dirt separator, side stream filter, glycol feed system, and flow meter; new 4-inch chilled water supply and return risers from the first floor to the roof with a new roof pipe enclosure; new building automation controls; an emergency eyewash/drench hose, service sink, and hose bibb; and related electrical, structural, crane lift, and wall patch and paint work. Piping will be valved and capped for a future third chiller. Alternate No. 1 keeps the existing 4-inch risers in the chase from the first floor to the sixth floor and connects the new piping to them. QA date - 11-24-2026 Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to be received by the Architect at least fourteen days prior to the date for receipt of Bids.

GC Bidding

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2026

January 7, 2027

Project location map

Multiple Locations, East Lansing, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed