Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 23, 2026 at 7:00 PM

Updated November 28, 2026

Site work and new construction of a playground / park / athletic field in Gulf Shores, Alabama. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Construction of pedestrian plaza areas, structural tie-ins, hardscaping, landscaping, and public amenities supporting the pedestrian bridge corridor. Questions Due Date: Nov 27th 2026, 6:00 PM EST Scope of Work: 1. 2. This Trade Contractor is responsible for all Bidding Documents, Contract Documents, and Technical Specifications as shown in the Project Specification Book. All shop drawings and submittal data are to be submitted to the Construction Manager within 10 days of Notice to Proceed. 3. This Trade Contractor is responsible for all Bidding Documents, Contract Documents, and Technical Specifications as shown in the Project Specification Book. 4. This Trade Contractor is responsible for but not limited to the following: a. Fine Grading b. Installation of Irrigation System C. All Plants, Bushes, Trees, Sod, etc. 5. This Trade Contractor shall be responsible for all site staking as required to complete site work scope of work. 6. All trench excavation and backfill shall be in accordance with the project documents. All spoil material shall be hauled offsite unless otherwise noted to remain onsite. This contractor shall re-grade these areas to match soil profile prior to excavation. 7. It is this Trade Contractor's responsibility to clean soil and debris off all surrounding roads as deemed by Owner and/or Construction Manager. 8. This Trade Contractor shall confirm, coordinate, and accept the layout established by previous Trade Contractor prior to beginning work. 9. The GSPBP-01 Sitework Contractor will install all required erosion control measures and BMP's. Each Trade Contractor shall protect all erosion control measures. Any erosion control measures damaged by a certain Trade Contractor, said Trade Contractor shall correct the damaged erosion control measures at their own expense. 10. It is this Trade Contractor's responsibility to coordinate with the Construction Manager and other trade packages before digging near any existing structures. 11. It is this Trade Contractor's responsibility to coordinate with Construction Manager on lay-down of any stored materials.

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
76
Bidding Soon
959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2026

February 2, 2027

Project location map

Multiple Locations, Gulf Shores, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed