Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 20, 2026 at 7:00 PM
Updated November 26, 2026
This is a service / maintenance or supply contract in South Base, Georgia. Contact the soliciting agency for additional information.
Depot-level repair services are required for nine competitive C-5 Fire Suppression System components to support the C-5 aircraft fleet through its projected retirement in 2040. Services include tear-down, evaluation, repair, testing, component procurement, packaging, handling, storage, transportation, and data collection. Repaired assets will be used to reduce current backorders and satisfy quarterly demand requirements supporting Air Force sorties and Programmed Depot Maintenance (PDM). The effort covers repair of the following components: 2-Inch Zone Fire Valve (P/N 7720011-106), Isolation Valve (P/N 7720012-105), Shutoff Valve (P/N 7720013-107), 1 1/4 -Inch Zone Fire Valve (P/N 7720015-107), Primary Pressure Relief & Overboard Relief Valve (P/N 7720125-101), Pressure Limiter Valve (P/N 7720142-101), Secondary Pressure Regulator (P/N 7720224-101), Fill Coupling Receptacle (P/N 7720017-102), and Backpressure Relief Valve (P/N 7720119-102). The projected contract period is five years, consisting of one base year and four one-year ordering periods. Repaired assets shall be delivered according to the contract schedule, with a requirement that 95 percent of deliveries are made on time and the remaining 5 percent no more than seven calendar days late. When delivery delays exceed seven calendar days, the contractor must notify the Contracting Officer to negotiate a revised delivery date. For SURGE or MICAP requirements, repaired assets already in contractor inventory shall be delivered within 30 calendar days of notification. If assets are not available at the contractor's facility, delivery shall be made within 30 calendar days after receipt of the assets requiring repair. The services are considered military-unique and do not meet the definitions of commercial products or non-developmental items under FAR Part 2. Consequently, the requirement is not suitable for acquisition using commercial item procedures under FAR Part 12. Responses are requested for market research purposes only. This notice does not constitute an award. Interested parties must submit responses by November 27, 2026. The Method of Contractor Selection has not been determined at this Time.
Final Planning
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2027
To Be Determined, South Base, GA
Related To This Project
South Base, GA
--
South Base, GA
Bid Date: May 27 2026
South Base, GA
Bid Date: Jul 29 2025
South Base, GA
Bid Date: Jul 01 2025
South Base, GA
Bid Date: Jul 31 2025
South Base, GA
Bid Date: May 16 2025
South Base, GA
Bid Date: Mar 02 2022
Savannah, GA
Bid Date: Dec 22 2026
Sandy Springs, GA
Bid Date: Jan 07 2027
Augusta, GA
Bid Date: Jan 07 2027
Cumming, GA
Bid Date: Dec 17 2026
Savannah, GA
Bid Date: Dec 03 2026
Marietta, GA
--
Buford, GA
Bid Date: Dec 03 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed