Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 22, 2026

Renovation of an educational facility in Buffalo, New York. Completed plans call for the renovation of a educational facility.

Lighting Replacement At 206 Please note that the required bid bond is 10%. Question Deadline 12/10/2026 Question submitted to : Trautman Associates 37 Franklin St Ste 100 Buffalo, NY 14202 No proposal or bid will be considered unless it is accompanied by a certified check, payable to the Board of Education, for an amount not less than 10 percent (10%) of the Base Bid, if based upon a lump sum price or ten percent (10%) of the unit price bid multiplied by the number of units estimated in the drawings and specifications, if based upon a unit price an in no case less than $50.00 which check shall be duly certified by an incorporated bank or trust company or, in lieu of such certified check, the bid shall be accompanied by a bid bond to the Board of Education, approved as required by the Corporation Counsel and the Comptroller of the City of Buffalo and to be executed by the bidder as principal and by a duly incorporated company, authorized to guarantee the performance of contracts and to do business in the State of new York as surety, in the penal amount of not less than ten percent (10%) of the bid if based upon a lump sum price or, ten percent (10%) of the unit bid multiplied by the number of units estimated in the drawings specifications, if based upon a unit price conditioned that, if the bid accompanying the bond is accepted the principal names in such bond will, whenever required, enter into a written contract for the performance of the work or improvement mentioned in such bid in accordance with the terms and conditions as provided in the drawings and specifications and upon the execution of such contract will furnish a bond for the faithful performance of said contract and that the penal sum of such bid bond in the amount of ten percent (10%) thereof shall be and become the minimum amount of whose bid is accepted shall fail to enter into the contract and five percent security for the performance of such contract as required upon notice to him as herein prescribed. The bidder or bidders whose proposal is accepted shall simultaneously with his delivery of the executed agreement deliver to the Board of Education on executed performance Bond (original and one (1) copy and an executed Labor & Material Bonds must be in the penal amount of one hundred percent (100%) of the full contract price and shall be approved by the corporation Counsel of the City of Buffalo as to form and by the Comptroller of the City of Buffalo as to sufficiency and shall have as surety thereon such surety company and/or companies as shall be acceptable and as are approved by the Board of Education.

Sub-Bidding

$5,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
241
Bidding Soon
4,271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2026

June 30, 2027

Project location map

150 Southside Pkwy, Buffalo, NY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed