Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 22, 2026

Site work for a water / sewer project in Flagstaff, Arizona. Working plans call for site work for a water / sewer project.

Construction of Phase 4 (Lower RDF Inlet) of the Rio De Flag Flood Control Project, a flood risk management initiative designed to convey 100-year flood discharges from Upper Rio De Flag and Clay Avenue Wash through downtown Flagstaff into the Lower Rio De Flag channel. The work includes construction of approximately 4,950 linear feet of flood conveyance infrastructure consisting of reinforced concrete box culverts, riprap-lined earthen trapezoidal channels, grouted stone channels, reinforced concrete transition structures, rectangular concrete channels, concrete wingwalls, drop inlets, junction structures, side drainage connections, and outlet headwalls. Additional work includes mass earthwork, soft rock excavation, hard basalt rock excavation, precision line drilling, specialized shoring, and controlled blasting. Construction will occur adjacent to active Burlington Northern Santa Fe (BNSF) Railway tracks and existing downtown infrastructure, requiring real-time geotechnical monitoring and coordination with railroad operations. The project also includes environmental remediation activities involving excavation, testing, handling, and disposal of petroleum-contaminated soils and removal of underground storage tanks. Supporting work consists of surface water diversion and control, groundwater dewatering, utility relocations, street restoration, traffic control, security fencing, automated irrigation systems, exterior landscaping, and a required 12-month plant establishment period. The contract will be awarded as a firm-fixed-price construction contract with a performance period of 1,095 calendar days. Location: Rio De Flag Flood Control Project, downtown Flagstaff, Coconino County, AZ 86001. The Method of Contractor Selection has not been determined at this Time.

Final Planning

$50,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
5
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2027

Project location map

Multiple Locations, Flagstaff, AZ

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed