Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 21, 2026 at 7:00 PM

Updated November 22, 2026

Demolition, site work, paving, new construction and renovation of a sidewalk / parking lot in Miami, Florida. Completed plans call for the construction of a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; and for the demolition of a sidewalk / parking lot.

Construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs, and gutters; reconstruction and repair of existing sidewalks, connectors, driveway approaches, curb ramps, curbs, and gutters; removal and disposal of existing pavements, trees, roots, and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers.

GC Bidding

$900,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
102
Bidding Soon
1,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2026

February 13, 2027

Project location map

Multiple Locations, Miami, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed