Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 24, 2026 at 7:00 PM

Updated November 28, 2026

Site work for a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

This contract is for the construction of a Primary Sedimentation Tank to increase ALCOSAN's wet weather peak treatment capacity to 600 million gallons per day. This will increase our total number of Primary Sedimentation Tanks from 9 to 10. As a part of this contract, the existing laboratory and industrial waste buildings will be demolished. The contract also includes upgrades to mechanical equipment in our existing Primary Sedimentation Tanks. This contract number will include a General, Electrical, HVAC and Electrical contracts. Bid Security shall be furnished by providing with the Bid a Certified Check or Bid Bond in the amount of 10% of the Bid Price. Any questions regarding the Contract Documents should be directed to Stephanie Downs, Michael Baker IntI, via email at Stephanie.downs@mbakerintl.com Any questions regarding the Purchase of Bidding Documents should be directed to Tyler Trainor, ALCOSAN, via email at contract.clerkst@alcosan.org. The Authority reserves the right to reject any or all bids, to waive any informality in any bid and to accept any bid should it be deemed in the interest of the Authority to do so. The final day for questions is COB January 22nd, 2027. Responses will be distributed as Addenda. MBE & WBE Participation (2.25 ); Lower-tier subcontractor participation counts towards 10%-25% goal.

GC Bidding

$200,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
180
Bidding Soon
2,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2027

April 15, 2027

Project location map

To Be Determined, Pittsburgh, PA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed